Theweitzcompany
Construction Project Engineer - Data Center Construction
San Marcos, Texas
Apply through hirly
Upload your resume and get a version tailored to this job, plus a cover letter, in about thirty seconds — before you create an account.
Apply with hirlyhirly's read of this role
- Seniority
- Mid level
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 3 Sept 2026
Derived automatically from the posting. Sign up to see how the role scores against your own resume.
the posting
The Weitz Company is currently accepting applications for an outstanding Construction Project Engineer to be located at our data center in San Marcos, TX!
The Project Engineer is responsible for several functions throughout the duration of assigned projects including planning, buyout, management and closeout. This role actively assists the project team in monitoring project status and identifying issues that may impact the project schedule and/or budget. The Project Engineer typically reports to the Project Manager.
The Weitz Company has been Building a Better Way since 1855. We are a full-service construction company, general contractor, design-builder, and construction manager with office locations throughout the United States. We believe our employees to be our most valuable asset, and we are committed to growing a diverse and inclusive culture that inspires, motivates, and continuously improves.
What You’ll Do:
Organize, review, update, maintain and post construction documents and drawings
Collaborate with project team to complete requests for information (RFI)
Review submittals and other project documents for accuracy against plans and specifications
Assist in preparing inspections, compliance audits and the non-conformance log
Monitor material and equipment delivery status
Maintain and distribute accurate project logs (i.e. buyouts, subcontractor material status reports, submittals, RFIs)
Understand scopes of work to be included in subcontracts and/or purchase order agreements
Track subcontractor requests for change; solicit pricing and draft change orders within delegated authority
Understand and assist with project schedule management
Attend regular project meetings; record and distribute meeting minutes
Obtain closeout information; gather punch list items; prepare as-built drawings; assist with warranty process
Perform other duties as assigned.
What We’re Looking For:
Experience:
A minimum of two (2) years of project engineering experience
Experience in a fast-paced environment
Industry-related college degree
Data center experience is strongly preferred
Skills:
Excellent leadership skills with a desire to mentor, coach, and develop a team
Ability to compare and analyze various systems and related cost impacts
Excellent verbal and written communication
Ability to balance and prioritize projects with impending deadlines
Detail-oriented and highly organized
Strong negotiation skills
Business acumen and relationship building skills
Technology:
Candidate should have experience with Microsoft Office Suite, Apple products (iPhone & iPad) and have the ability to learn specific software.
Solid systems experience with Procore, JDE, and Asta is preferred.
Training will be provided on company standards.
What We Offer:
Competitive Pay
Rewarding Bonus Program
Comprehensive Benefits Package with Tax-Advantaged HSA and FSA offerings
Employer-Paid Short- and Long-Term Disability Programs
Employer-Paid Life Insurance
Generous Paid Time Off Provisions
401K Retirement Savings Plan with Company Match
Tuition Reimbursement
Fully Paid Parental Leave
Voluntary Products Including: Critical Illness Insurance and Accident Insurance
Corporate Wellness Program with Wellness Time Off and Rewards
Visa sponsorship is not available for this position at this time.
The Company does not accept unsolicited resumes from search firms or agencies. Any resume submitted to any employee of the Company without a prior written search agreement will be considered unsolicited and the property of the Company. Please, no phone calls or emails.
The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates) recognizes the value of and is committed to hiring and retaining a diverse and inclusive workforce. We are an Equal Opportunity Employer and follow applicable affirmative action guidelines and policies. All qualified applicants will receive consideration for employment (including minorities, females, veterans, and individuals with disabilities, regardless of sexual orientation, gender identity, or other protected categories in accordance with applicable state and federal laws). The Company is a drug and alcohol-free workplace and background checks are required if applicable. Click here to review our Privacy Notice.
#LI-KR1
Similar jobs
- Supervisory Healthcare Engineer - Supervisory Project EngineerVeterans Health Administration · Sheridan, Wyoming, United StatesFirst seen today
- Supervisory Healthcare Engineer - Supervisory Project EngineerVeterans Health Administration · Sheridan, Wyoming, United StatesFirst seen today
- Civil Engineer Highway Construction Project Engineer - DHFederal Highway Administration · Grand Junction, Colorado, United StatesFirst seen today
- Project Engineer ITti · Anderson, SCFirst seen today
- Mechanical Project EngineerVanderlande · Marietta, GA USAFirst seen today
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job