Oracle
Data Center Construction Cost Estimator (Nashville, TN)
Nashville, TN, United States
Apply through hirly
Upload your resume and get a version tailored to this job, plus a cover letter, in about thirty seconds — before you create an account.
Apply with hirlyhirly's read of this role
- Seniority
- Mid level
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 27 Sept 2026
Derived automatically from the posting. Sign up to see how the role scores against your own resume.
the posting
Oracle publishes the full text of this posting on its own careers page.
Read the full posting ↗Similar jobs
- Cost EstimatorCandidate Experience site · Grand-rapids, United StatesFirst seen today
- Cost Estimator (Mid)Cherokee Federal · Joint Base Pearl Harbor-Hickam, HI, United StatesFirst seen today
- Civil Engineering Cost EstimatorCandidate Experience site · IRVINE, CA, United States; PHOENIX, AZ, United States; SEATTLE, WA, United States; REDDING, CA, United States; EUREKA, CA, United States; SANTA ROSA, CA, United States; SACRAMENTO, CA, United States; ROSEVILLE, CA, United States; SAN LUIS OBISPO, CA, United States; LOS ANGELES, CA, United States; LONG BEACH, CA, United States; SAN DIEGO, CA, United StatesFirst seen today
- Launch Cost Estimator AnalystSAIC · El Segundo, CA, United StatesFirst seen today
- Estimator/Cost Estimator - GatewayArcadis · New York, NY, United States; Newark, NJ, United StatesFirst seen today
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job