Sundt
MEP Field Superintendent - Data Center Construction
Lockhart, TX, United States
Apply through hirly
Upload your resume and get a version tailored to this job, plus a cover letter, in about thirty seconds — before you create an account.
Apply with hirlyhirly's read of this role
- Seniority
- Mid level
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 27 Sept 2026
Derived automatically from the posting. Sign up to see how the role scores against your own resume.
the posting
Sundt publishes the full text of this posting on its own careers page.
Read the full posting ↗Similar jobs
- Field SuperintendentMydpr · Sacramento, CAFirst seen today
- Field SuperintendentClaytonhomes · Tooele, UTFirst seen today
- Field SuperintendentACCO Engineered Systems · Sacramento, CA, United StatesFirst seen today
- Field Superintendent - Sheet MetalACCO Engineered Systems · Denver, CO, United StatesFirst seen today
- CBI-Field SuperintendentMcDermott · Sabine Pass, TX, United StatesFirst seen today
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job