hirly

KP Group

Asst. Manager

KUTCHH, India

See how you match this job — and similar ones. Free.

Upload your resume and hirly scores it against this role at KP Group first, then against similar open jobs, and shows where you fit and why.

PDF or DOCX, up to 12MB. No sign-up to see your matches.

Get past the screening software and onto a recruiter's desk

hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.

  • Keywords matched to this posting
  • Fit score before you apply
  • Cover letter included

Matched against 2.4M live jobs from 200,000+ employers in 200+ countries.

Tailor my resume for this job →

Apply from your AI assistant

Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.

Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.

hirly's read of this role

Seniority
Lead / management
Country
IN
Work mode
On-site / unstated
First seen by hirly
23 Sept 2026

Derived automatically from the posting. Upload your resume above to see how the role scores against it.

the posting

Inception and Survey of plant

Verification of plant Layout

Verification of material Checklist

Communicate with vendors and subcontractors for smooth execution of work at site.

Following Installation Guidelines provided to them for installation of plant

Coordinating with different departments to smoother execution of projects.

Joint inspection of material receipts at site

Monitor the construction of solar power plant facilities.

Verify and certify running bills raised by I&C /Execution Agencies as per actual site work progress.

Review of project planning, scheduling and monthly progress reports.

Responsible for execution of work as per Quality Control plan and Safety Plan (HSE Norms).

To monitor everyday site execution work, progress & submission of site progress report to HO, i.e., overall site work monitoring.

Coordinate with Contractors to ensure the project is delivered as per technical specification and compliance.

Making sure all electrical work are as per drawings & schedule.

Responsible for Electricals pre-commissioning activity of Solar Power plant

Responsible for verifying the quality of all Electricals work as per standards, specifications, drawings, and instructions.

Ensuring that the construction project is completed on time and within budget.

Need to give Handover to O&M team

Original posting on KP Group's site ↗

Browse similar roles

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job
Asst. Manager – KP Group · KUTCHH | hirly.me