hirly

KP Group

Asst. Vice President

Surat, India

See how you match this job — and similar ones. Free.

Upload your resume and hirly scores it against this role at KP Group first, then against similar open jobs, and shows where you fit and why.

PDF or DOCX, up to 12MB. No sign-up to see your matches.

Get past the screening software and onto a recruiter's desk

hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.

  • Keywords matched to this posting
  • Fit score before you apply
  • Cover letter included

Matched against 2.4M live jobs from 200,000+ employers in 200+ countries.

Tailor my resume for this job →

Apply from your AI assistant

Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.

Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.

hirly's read of this role

Seniority
Executive
Country
IN
Work mode
On-site / unstated
First seen by hirly
23 Sept 2026

Derived automatically from the posting. Upload your resume above to see how the role scores against it.

the posting

Job Description: Project Manager – Green Hydrogen & Ammonia

Position Title

AVP - PROJECTS

Location

Surat HO (Montessa)

Role Overview

The Project Manager will lead end-to-end execution of green hydrogen and ammonia projects, from concept development through FEED, EPC/EPCM, commissioning, and operations support. The role requires strong techno-commercial expertise in hydrogen electrolysis, ammonia synthesis, storage/export systems, and integrated energy projects , ensuring delivery aligned with cost, schedule, and quality objectives.

Key Responsibilities

1. Project Planning & Execution

  • Lead full project lifecycle: concept selection, feasibility studies, FEED, detailed engineering, procurement, construction, and commissioning .
  • Develop and manage integrated project schedules, cost estimates (Class II), and execution strategies .
  • Ensure alignment of project scope with business case, stakeholders, and investment approvals.

2. Green Hydrogen & Ammonia Technology Management

  • Manage projects involving:
  • Hydrogen production via electrolysis
  • Green ammonia synthesis and storage systems
  • Hydrogen liquefaction, compression, and export/import systems
  • Oversee integration of upstream (electrolysis) with downstream (ammonia, storage, transport).
  • Support design and execution of:
  • Ammonia synthesis plants
  • Ammonia dissociation units (H₂ recovery)
  • Hydrogen liquefaction facilities [AMITPARLIKAR (1) (1) | Word]

3. Stakeholder & Interface Management

  • Act as the primary interface with clients, licensors, EPC contractors, JV partners, and internal leadership.
  • Coordinate with global clients such as energy majors and national oil companies. [AMITPARLIKAR (1) (1) | Word]
  • Lead multidisciplinary teams across process, mechanical, civil, and instrumentation disciplines. [AMITPARLIKAR (1) (1) | Word]

4. Engineering & Technical Oversight

  • Supervise development of:
  • Process design packages (PFDs, P&IDs, HMBs)
  • Equipment datasheets and technical specifications
  • Operating manuals and commissioning procedures [AMITPARLIKAR (1) (1) | Word]
  • Ensure optimal process efficiency, energy integration, and sustainability performance .
  • Review and approve EPC deliverables in line with international standards. [AMITPARLIKAR (1) (1) | Word]

5. Commercial & Proposal Management

  • Lead techno-commercial evaluations for large-scale projects (up to billion-dollar investments). [AMITPARLIKAR (1) (1) | Word]
  • Manage:
  • Bid evaluation (technical and commercial)
  • Vendor prequalification
  • Contract and risk assessment [AMITPARLIKAR (1) (1) | Word]

Drive proposal development for hydrogen and ammonia value chain opportunities.

6. Risk, Safety & Compliance

  • Lead risk assessments including:
  • HAZID, HAZOP, SIL, ALARP studies [AMITPARLIKAR (1) (1) | Word]
  • Ensure compliance with:
  • Environmental and safety standards
  • International codes and client specifications

Maintain project risk registers and mitigation strategies.

7. Construction & Commissioning Oversight

  • Coordinate site execution and interface with contractors during project delivery.
  • Support commissioning activities for:
  • Hydrogen plants
  • Ammonia units
  • Storage and export systems

Ensure readiness for operations and handover.

8. Team Leadership & Capability Building

  • Lead and mentor multidisciplinary engineering teams . [AMITPARLIKAR (1) (1) | Word]
  • Drive performance management, training, and capability development.
  • Foster a culture of technical excellence, safety, and innovation.

Required Qualifications

  • Bachelor’s degree in Chemical Engineering (Master’s preferred). [AMITPARLIKAR (1) (1) | Word]
  • 15–25+ years of experience in oil & gas, petrochemical, or clean energy sectors.
  • Proven experience in EPC/EPCM/PMC project execution .

Preferred Experience

  • Direct involvement in:
  • Green Hydrogen projects (electrolysis-based)
  • Ammonia synthesis / storage / export projects
  • Gasification, syngas, or hydrogen value chain projects [AMITPARLIKAR (1) (1) | Word]
  • Experience in mega projects (>$500M to $1B+). [AMITPARLIKAR (1) (1) | Word]
  • Exposure to international projects (Middle East / Europe / Asia).

Technical Skills

  • Process simulation tools: Aspen HYSYS, Aspen Plus, PRO/II, UniSim [AMITPARLIKAR (1) (1) | Word]
  • Engineering tools for pipeline and process design (OLGA, PIPESIM, etc.) [AMITPARLIKAR (1) (1) | Word]
  • Strong knowledge of hydrogen and ammonia technologies

Core Competencies

  • Project management & execution excellence
  • Techno-commercial acumen
  • Strategic thinking and concept development
  • Stakeholder management and leadership
  • Risk management and decision-making

Key Deliverables / KPIs

  • On-time, on-budget project completion
  • Successful commissioning of hydrogen/ammonia facilities
  • Safety compliance and zero major incidents
  • Cost optimization and value engineering
  • High client satisfaction
Original posting on KP Group's site ↗

Browse similar roles

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job
Asst. Vice President – KP Group · Surat | hirly.me