This role has closed. KALCON has taken the posting down.
hirly last saw it live on 8 November 2026. See similar open roles below, or browse the live board.
KALCON
Field Analyst - Data Center Construction
Quinlan, TX
Similar open jobs
hirly's read of this role
- Seniority
- Mid level
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 3 Nov 2026
Derived automatically from the posting.
the posting
The Field Schedule Analyst serves as the Owner’s Representative responsible for independent, field-based verification of construction progress and alignment with the master schedule. This role is on site a minimum of three days per week, performing physical walkdowns, validating installed quantities, and engaging directly with the General Contractor and subcontractor field teams. The remaining time is dedicated to compiling verified quantities and preparing weekly progress data for the scheduling team. The Analyst confirms that reported actuals match physical work in place, identifies sequencing, access, and logistics risks to schedule adherence, and tracks constraints and missed commitments to resolution. The objective is to give the project team and the scheduling team a single, verified picture of progress.
Minimum Qualifications:
Construction field experience with a working understanding of trade sequencing, means and methods, and installation rates
Familiarity with CPM scheduling concepts and Primavera P6, with the ability to read and interpret schedule activities and look-aheads
Proficiency with quantity tracking tools (Excel or equivalent) and the ability to maintain organized, auditable records
Ability to perform physical progress verification in active construction environments and to be on site a minimum of three days per week
Strong communication skills and the confidence to constructively question reported progress with subcontractor field leadership
Ability to coordinate effectively with General Contractor superintendents, subcontractor foremen and project managers, and scheduling team members
Bachelor’s degree in Engineering, Construction Management, or a related field preferred, but not required with equivalent experience
Duties and Responsibilities:
Field Verification and Quantity Tracking
Verify daily and weekly installed quantities and construction progress through physical walkdowns of active work areas
Validate subcontractor-reported actuals against physical work in place, by system, area, and activity
Maintain a running quantity tracking log by trade and work area that ties back to schedule activities and the project quantity basis
Prepare daily field verification notes and photo documentation
Schedule Alignment
Compare field progress against the master schedule, the current look-ahead, and upcoming commitments
Challenge discrepancies between reported progress and actual field conditions, and escalate unresolved variances to the project team
Identify sequencing conflicts, trade stacking, and access or logistics issues that threaten schedule adherence, and recommend corrective adjustments
Identify opportunities to improve schedule adherence, including re-sequencing, resource reallocation, and work-front optimization
Maintain a variance log of discrepancies between reported and verified progress, with resolution status
Subcontractor Coordination
Coordinate with subcontractor foremen and superintendents to confirm planned versus completed work on a daily basis
Identify missed commitments, constraints, and roadblocks (materials, manpower, access, RFIs, inspections) and track them to resolution
Work with subcontractors to define realistic recovery plans and confirm that recovery commitments are reflected in the look-ahead
Maintain a constraint and missed-commitment log with recovery actions and responsible parties
Progress Reporting
Provide accurate, verified weekly progress data to the project scheduling team in the agreed format and cadence to support schedule updates
Prepare a weekly verified installed-quantity and percent-complete report by trade and area
Flag activities that are reported complete but not physically complete, or physically complete but not yet reported, prior to each update cycle
Participate in weekly schedule review meetings and provide a field-based perspective on progress and forecast dates
Report to the KALCON Project Controls / Scheduling Lead, with day-to-day direction from the client project team
Benefits Offered:
Medical insurance
Dental insurance
Vision insurance
Life insurance
Accident insurance
Long term disability
401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
15 days of paid time off
8 paid national holidays
Reimbursement for professional licenses and certifications
Submission Requirements:
At a minimum, the candidate’s professional resume must include the following:
List of all Educational Achievements
List of all Professional Licenses or Certificates
List of Awards Received
Detailed Employment History with each company including:
Name & Contact Information of the firm or agency
Start Date and End Date (Month & Year)
Positions Held
At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.
Listed on hirly, a job board. hirly is not the employer: KALCON is hiring for this role.