KALCON
MEP/OFCI Project Manager (Owner's Representative) - Data Center Construction
Cedar Rapids, IA
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Matched against 2.4M live jobs from 200,000+ employers in 200+ countries.
Tailor my resume for this job →Apply from your AI assistant
Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Lead / management
- Stated salary
- $140,000 – $220,000 per year
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 28 Sept 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
KALCON is seeking an experienced MEP/OFCI Project Manager to serve as an Owner’s Representative on large-scale, mission-critical construction projects. This role represents the owner/developer’s interests throughout design, construction, commissioning, and closeout, with primary responsibility for oversight and coordination of mechanical, electrical, plumbing, fire protection, controls, and related building systems. The MEP Project Manager works closely with design teams, contractors, vendors, commissioning agents, and client stakeholders to ensure MEP systems are planned, coordinated, installed, tested, and turned over in accordance with project requirements, schedule milestones, quality standards, and safety expectations.
Minimum Qualifications:
- Bachelor’s degree in Engineering, Construction Management, or a related field preferred, but not required with equivalent experience.
- 5+ years of experience working with MEP systems on commercial, industrial, mission-critical, or data center construction projects in a project management, field management, or owner-support role.
- Working knowledge of MEP systems (electrical, mechanical, plumbing, fire protection, and controls) sufficient to support coordination, review, and oversight activities.
- Experience interacting with general contractors, subcontractors, and design teams, with the ability to track progress, observe work in the field, and flag potential issues.
- Experience on data center or mission-critical projects is a strong plus, but not required.
- Proficiency with common construction tools such as Procore, Bluebeam, Microsoft Office, or similar platforms.
Tasks and Responsibilities :
- Oversee multiple MEP tenant fit-out and base building projects simultaneously, maintaining updated budgets, schedules, and status reports across all mechanical, electrical, and plumbing scopes.
- Conduct regular schedule reviews and lead weekly project meetings; perform routine site walks to validate installation progress, sequencing, and alignment with project milestones.
- Serve as a key liaison between the Client, contractors, vendors, and internal stakeholders, supporting coordination of procurement, equipment delivery, and overall project execution.
- Manage and coordinate project activities including document reviews, cost optimization, contract administration, design modifications, and GMP/buyout processes.
- Lead MEP design coordination, preconstruction, and construction activities, including submittal reviews, trade coordination, and QA/QC oversight in partnership with the construction team.
- Maintain and enforce project quality and safety standards through regular site observations, coordination with safety teams, and reporting of key metrics.
- Review and approve contractor pay applications, change orders, and other cost-related documentation; track and manage overall project financial performance.
- Facilitate and document project meetings (OAC, design, coordination, and trade partner meetings), maintaining clear communication and accountability across all stakeholders.
- Oversee document control and project management systems (e.g., Procore), ensuring accurate records, reporting, and successful project closeout.
- Coordinate with design teams, contractors, and stakeholders to support overall project planning, phasing, and execution strategies.
- Support permitting and entitlement processes, coordinating with AHJs and ensuring compliance with all regulatory requirements.
- Collaborate with Operations and Commissioning teams to support construction in live environments, including development of MOPs and coordination of critical work activities.
- Support commissioning, startup, and turnover activities, ensuring systems are delivered in accordance with project requirements and operational standards.
- Manage third-party vendors and ensure successful delivery of all assigned scopes.
- Monitor project budgets and schedules, providing regular updates and reports to leadership and key stakeholders.
- Contribute to continuous improvement of internal project management processes and best practices.
- Perform additional duties as assigned by Management
Benefits Offered:
Medical insurance
Dental insurance
Vision insurance
401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
15 days of paid time off
8 paid National Holidays
Reimbursement for professional licenses and certifications
- Submission Requirements :
- At a minimum, the candidate's professional resume must include the following:
- - List of all Educational Achievements
- - List of all Professional Licenses or Certificates
- - List of Awards Received
- - Detailed Employment History with each company
- o Name of the firm or agency
- o Start Date and End Date (Month & Year)
- o Positions Held
At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.
Salary Range
$140,000 — $220,000 USD
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job