hirly

KALCON

TFO Field Project Manager (Owner's Representative) - Data Center Construction

Cedar Rapids, IA

See how you match this job — and similar ones. Free.

Upload your resume and hirly scores it against this role at KALCON first, then against similar open jobs, and shows where you fit and why.

PDF or DOCX, up to 12MB. No sign-up to see your matches.

Get past the screening software and onto a recruiter's desk

hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.

  • Keywords matched to this posting
  • Fit score before you apply
  • Cover letter included

Matched against 2.5M live jobs from 200,000+ employers in 200+ countries.

Tailor my resume for this job →

Apply from your AI assistant

Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.

Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.

hirly's read of this role

Seniority
Lead / management
Stated salary
$140,000 – $220,000 per year
Country
US
Work mode
On-site / unstated
First seen by hirly
28 Sept 2026

Derived automatically from the posting. Upload your resume above to see how the role scores against it.

the posting

Seeking a Field Project Manager to provide Owner Representation during the tenant fit-out of multiple buildings on a data center campus - Cedar Rapids, IA

Minimum Qualifications :

Bachelor's degree in construction management or engineering, or applicable trade/superintendent experience.

7-10 years of experience working in either design or construction of projects. Experience in Labs, Semiconductor, Data Center, and/or Critical Facility Construction is necessary.

Proficient use of MS-Word, Excel, PowerPoint, Project

Strong written and oral communication skills to exchange information with senior management, service providers, workers, and contractors

  • Tasks and Responsibilities :
  • Field Management Focused
  • - Safety Oversight
  • - Schedule Oversight - Day-to-Day Tracking/Management
  • - Owner/GC Coordination: Base Build GC vs. Fit-Out GC
  • - MOP Coordination
  • - Delivery Coordination
  • - Site Logistics Coordination
  • - QA/QC
  • - Diving Into Plans/Specs - Understand Design Intent/Scope/Etc.
  • - Ensuring GC is Executing QA/QC Plan (Project Specific)
  • - Tenant Fit-Out Experience: Fast Paced Schedule
  • - Busway/RPP's, Hot Aisle Containment, Conveyance, Etc.
  • - Existing Buildings Retrofits: Added CRAH's, Power/Cooling, PQM Retrofit, Etc.
  • - Commissioning
  • - Submittals, RFI's, Procurement Log
  • - Other Items:
  • - OFCI Tracking
  • - OAC Meetings
  • - GC Weekly Reports, Safety Metrics
  • - Must be on the job 5 day a week 6:30-3:30
  • Other Responsibilities (secondary):
  • - Design Management
  • - Budget/Cost
  • - Change Management
  • - Pay Apps
  • Schedule:
  • - Review construction manager's (CM) monthly forecast.
  • - Hold weekly CPM schedule review meetings
  • - Attend multiple CM/subcontractor detailed planning meetings
  • - Owner Furnished Contractor Installed (OFCI) equipment schedule management
  • - Vendor start up scheduling
  • - Commissioning schedule coordination
  • - Owner/Direct vendor schedule management (IT, Roofing Consultant, Geotech, Third Party Inspectors)
  • - Customer Fitout - schedule management
  • - Customer Fitout - Phase turn over alignment (base build & Tenant)
  • Cost:
  • - GMP buyout review and support
  • - GMP buyout detailed analysis and ownership of recommendations
  • - Provide VE recommendations with analysis
  • - Change order review and approval (cost approval and process flow)
  • - Proactive cost avoidance/reduction ideas
  • - Monthly pay application review
  • Field:
  • - QA/QC general oversight
  • - QA/QC daily review and inspection with CM
  • - Safety general oversight
  • - Safety daily review & inspection with CM
  • - facility coordination (MOP's, Notifications)
  • - Assess weekly progress and provide accurate reporting
  • - Manage OFCI equipment inspection/receiving process
  • Project Management:
  • - Process cost documents (pay apps, change orders, etc.)
  • - Manage and attend weekly OAC meetings and minutes
  • - Provide weekly project reporting
  • - Manage project closeout process (financial, O&M's, punchlist, Ops, etc.)
  • Design:
  • - After initial design, manage design coordination efforts
  • - Coordinate customer fit out design package integration (non base-build)
  • - Validate design cost and process changes
  • - Management of construction administration process
  • Permit/AHJ:
  • - Manage and communicate overall permit process
  • - AHJ inspection and certificate of occupancy process management.
  • Benefits Offered:
  • Medical insurance
  • Dental insurance
  • Vision insurance

Life Insurance

Accident Insurance

  • Long Term Disability
  • 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
  • 15 days of paid time off
  • 8 paid national holidays
  • Reimbursement for professional licenses and certifications
  • Submission Requirements:
  • At a minimum, the candidate's professional resume must include the following:
  • - List of all Educational Achievements
  • - List of all Professional Licenses or Certificates
  • - List of Awards Received
  • - Detailed Employment History with each company
  • o Name of the firm or agency
  • o Start Date and End Date (Month & Year)
  • o Positions Held
  • o List of Projects/Programs Managed including project value, location of assignment, roles and responsibilities and contribution to each project

At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.

Salary Range

$140,000 — $220,000 USD

Original posting on KALCON's site ↗

Browse similar roles

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job
TFO Field Project Manager | hirly.me