hirly

Ferrovial

Traffic Control Foreman

Fort Worth

See how you match this job — and similar ones. Free.

Upload your resume and hirly scores it against this role at Ferrovial first, then against similar open jobs, and shows where you fit and why.

PDF or DOCX, up to 12MB. No sign-up to see your matches.

Get past the screening software and onto a recruiter's desk

hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.

  • Keywords matched to this posting
  • Fit score before you apply
  • Cover letter included

Matched against 2.5M live jobs from 200,000+ employers in 200+ countries.

Tailor my resume for this job →

Apply from your AI assistant

Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.

Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.

hirly's read of this role

Seniority
Mid level
Country
US
Work mode
On-site / unstated
First seen by hirly
27 Sept 2026

Derived automatically from the posting. Upload your resume above to see how the role scores against it.

the posting

About us:

North Tarrant Infrastructure, LLC is one of the subsidiaries of the Ferrovial Group in the U.S. It is currently working on several projects in the U.S., including the North Tarrant Express (NTE) Projects (“NTE Projects”). The NTE Extension Project is a part of the NTE Projects, which consist of a series of major highway improvements to the critical I-820 and SH-121/183 corridor in North Tarrant County, Texas. The NTE Projects will relieve congestion, improve safety, and provide for anticipated traffic growth in one of the country’s fastest developing regions. The NTE First Project was a $1.451 billion design-build project consisting of rebuilding the existing main lanes as well as adding four toll-managed lanes, frontage roads and auxiliary lanes in the corridor between I-35 West and Industrial Boulevard. The NTE Extension Project is the next part of the NTE Projects. The construction of the original $984 million part of the project (Segment 3A) was completed by North Tarrant Infrastructure, LLC, and the current $580.5 million part (Segment 3C) of the NTE Extension Project is presently being carried out by North Tarrant Infrastructure, LLC.

Job Description:

Traffic Control Foreman

Summary

The position of Traffic Control Foreman will perform all traffic control activities for the project under the direction of the Traffic Control Manager.

Responsibilities

Perform all Traffic Control operations and personnel.

Ensure safety and compliance with the Traffic Management plan in all Traffic Control operations.

Administer Traffic Management Plan developed in conjunction with project Construction Managers.

Maintain Traffic Control Field operations compliant with the Traffic Management Plan.

Ensure timely traffic control operations in support of construction activities.

Provide limited supervision to others through motivation, direction, review and feedback of assigned tasks.

Minimum Requirements

Certified by Texas Engineering Extension Service (TEEX) in “Work Zone traffic Control”.

Minimum of five (5) years of experience of progressive responsibility in similar positions.

Experience on large highway, bridge/structures, paving, and/or utility relocation projects as a contractor.

Original posting on Ferrovial's site ↗

Browse similar roles

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job