KP Group
Asst. Manager
Khavda, India · Vadodara, India · Bhuj, India
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Apply from your AI assistant
Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Lead / management
- Country
- IN
- Work mode
- On-site / unstated
- First seen by hirly
- 23 Sept 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
Assistant Manager – Robotic Installation & Projects
Position Overview
We are seeking an Assistant Manager to lead the end-to-end installation and commissioning of robotic solar cleaning systems. This role focuses on project execution—from site readiness and hardware mounting to software integration—ensuring the robotic infrastructure is fully functional before handing over to the operations team.
Core Project Responsibilities
- Site Readiness & Planning: Conduct site surveys to assess panel tilt, row alignment, and docking station locations; verify that the site is ready for robotic deployment.
- Installation Supervision: Lead the mechanical and electrical installation of robot tracks, docking stations, and communication gateways (Wi-Fi/Zigbee/LoRa).
- System Commissioning: Oversee the initial calibration, sensor alignment (IR/Ultrasonic), and mapping of the robotic cleaning paths across the solar array.
- Technical Testing: Conduct rigorous "First-Run" tests to identify mechanical obstructions or software bugs; ensure robots navigate row-to-row transitions safely.
- Safety Documentation: Prepare and enforce project-specific safety plans, focusing on lifting operations, electrical safety, and human-robot exclusion zones during setup.
- Subcontractor Management: Coordinate with third-party vendors for civil works (base foundations) and electrical wiring for charging stations.
Candidate Requirements
- Background: 3–5 years in Project Engineering or E&C (Erection & Commissioning) within the solar or industrial automation sector.
- Technical Skills: Hands-on experience with mechanical assembly, DC power systems, and configuring IoT/PLC-based controllers.
- Project Tools: Proficiency in reading technical drawings (AutoCAD) and managing project timelines (MS Project/Excel).
- Reporting: Ability to maintain daily progress reports (DPRs), punch lists, and commissioning certificates.
- Mobility: High readiness for site-based work during the project installation phase.
Listed on hirly, a job board. hirly is not the employer: KP Group is hiring for this role.
Similar jobs
- Asst Manager For Steel Plant - Rajgangpur , OdishaVinayak Outsourcing Works · Orissa, IndiaFirst seen yesterday
- Asst Manager / Deputy Manager - Traded Goods BuyerBosch Group · Bangalore, Karnataka, IndiaFirst seen 2d ago
- Asst Manager - CivilJAKSON Group · Bikaner, Rajasthan, IndiaFirst seen 7d ago
- Asst Manager - DesignLT-Larsen & Toubro · IndiaFirst seen 8d ago
- Asst Manager /Senior Executive/Executive Performance Marketing - D2C(Meta and Google Ads)Renee Cosmetics · Ahmedabad, IndiaFirst seen 11d ago
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job