hirly

KALCON

Asst. Project Manager - Data Center Construction

Portsmouth, OH

hirly Pro

Get in front of the people hiring at KALCON

  • Reach the hiring manager at KALCON on LinkedIn, from your own account
  • hirly applies to this job for you, with unlimited applications
  • A resume and cover letter written for this job, unlimited
  • The hiring manager and recruiter at KALCON, with contact details
Get Pro for this job →

$49 a month · ₹1,999 for 30 days in India · cancel any time

See how you match this job — and similar ones. Free.

Upload your resume and hirly scores it against this role at KALCON first, then against similar open jobs, and shows where you fit and why.

PDF or DOCX, up to 12MB. No sign-up to see your matches.

Get past the screening software and onto a recruiter's desk

hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.

  • Keywords matched to this posting
  • Fit score before you apply
  • Cover letter included

Matched against 2.3M live jobs from 220,000+ employers in 200+ countries.

Tailor my resume for this job →

Apply from your AI assistant

Connect hirly to Claude or ChatGPT and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending.

Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.

hirly's read of this role

Seniority
Lead / management
Stated salary
$100,000 – $150,000 per year
Country
US
Work mode
On-site / unstated
First seen by hirly
28 Sept 2026

Derived automatically from the posting. Upload your resume above to see how the role scores against it.

the posting

Seeking an Entry to Mid level Assistant Project Manager to support Owner Representation on the construction of a hyperscale data center campus in Portsmouth, OH. This individual will work under the direction of the Project Manager to support various scopes during the base build of multiple buildings on campus.

Minimum Qualifications:

Bachelor’s degree in construction management or engineering, or applicable trade/superintendent experience.

2-5 years of experience working in either design or construction of projects. Experience in Labs, Semiconductor, Data Center, and/or Critical Facility Construction is preferred.

Proficient use of MS-Word, Excel, PowerPoint, Project

Strong written and oral communication skills to exchange information with senior management, service providers, workers, and contractors

Tasks and Responsibilities:

Schedule:

Assist in reviewing the construction manager’s (CM) monthly forecast.

Support weekly CPM schedule review meetings

Attend CM/subcontractor detailed planning meetings

Support Owner Furnished Contractor Installed (OFCI) equipment schedule management

Assist with vendor start up scheduling

Support commissioning schedule coordination

Support Owner/Direct vendor schedule management (IT, Roofing Consultant, Geotech, Third Party Inspectors)

Customer Fitout - assist with schedule management

Customer Fitout - support phase turn over alignment (base build & Tenant)

Cost:

Support GMP buyout review

Assist with GMP buyout detailed analysis and preparation of recommendations

Assist in developing VE recommendations with analysis

Review change orders and support the approval process (cost review and process flow)

Identify and contribute proactive cost avoidance/reduction ideas

Assist with monthly pay application review

Field:

Support QA/QC general oversight

Participate in QA/QC daily review and inspection with CM

Support safety general oversight

Participate in safety daily review & inspection with CM

Assist with facility coordination (MOP’s, Notifications)

Track weekly progress and assist with accurate reporting

Support OFCI equipment inspection/receiving process

Project Management:

Process cost documents (pay apps, change orders, etc.)

Attend weekly OAC meetings and assist with minutes

Assist with weekly project reporting

Support project closeout process (financial, O&M’s, punchlist, Ops, etc.)

Design:

After initial design, support design coordination efforts

Assist with customer fit out design package integration (non base-build)

Assist in validating design cost and process changes

Support the construction administration process

Permit/AHJ:

Support and communicate the overall permit process

Assist with AHJ inspection and certificate of occupancy process management

  • Benefits Offered:
  • Medical insurance
  • Dental insurance
  • Vision insurance

Life Insurance

Accident Insurance

  • Long Term Disability
  • 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
  • 15 days of paid time off
  • 8 paid national holidays
  • Reimbursement for professional licenses and certifications
  • Submission Requirements:
  • At a minimum, the candidate's professional resume must include the following:
  • - List of all Educational Achievements
  • - List of all Professional Licenses or Certificates
  • - List of Awards Received
  • - Detailed Employment History with each company
  • o Name of the firm or agency
  • o Start Date and End Date (Month & Year)
  • o Positions Held
  • o List of Projects/Programs Managed including project value, location of assignment, roles and responsibilities and contribution to each project

At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.

Salary Range

$100,000 — $150,000 USD

Original posting on KALCON's site ↗

Listed on hirly, a job board. hirly is not the employer: KALCON is hiring for this role.

Browse similar roles

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job