KBR
BGAD: Senior Construction Scheduler ( Contingency )
Fort Knox, Kentucky · Richmond, Kentucky
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Matched against 2.7M live jobs from 200,000+ employers in 200+ countries.
Tailor my resume for this job →Apply from your AI assistant
Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Senior
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 3 Oct 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
Title:
BGAD: Senior Construction Scheduler ( Contingency )
Belong, Connect, Grow, with KBR!
Program Summary
KBR’s Chemical Plant & Munitions program supports critical national defense and government missions through the execution of complex manufacturing, construction, and commissioning efforts, into manufacturing operations. The program operates in highly regulated environments and requires close coordination between customers, suppliers, and internal teams to deliver safe, compliant, and high‑quality outcomes across the program lifecycle.
Job Summary
KBR is seeking a Senior Construction Scheduler for the construction of the new Blue Grass Army Depot Energetics Center of Excellence explosives manufacturing facility.
Roles & Responsibilities
- Develop and maintain baseline schedules and prepare what‑if scenarios to support project decision‑making
- Apply schedule risk management techniques, including contingency planning
- Perform critical path analysis, schedule integrity reviews, and progress reporting
- Build and manage resource‑loaded schedules, including producing histograms and schedule insights
- Work collaboratively with multidisciplinary engineering and project teams to ensure sequencing accuracy and timely program delivery
- Utilize tools including Primavera P6, MS Project, and Excel (Power BI experience highly preferred)
- Support proposal development, capture activities, and long‑range program growth strategies
- Other duties as assigned
Basic Qualifications
- Bachelor’s degree in Engineering, Project Management, or a related field.
- 5-10 years’ experience in project scheduling, ideally within major infrastructure or water projects
- Strong proficiency in Primavera P6 and MS Project
- Understanding of EVM, SPI, schedule risk analysis, and progress measurement
- Strong communication skills with the ability to engage effectively with project stakeholders
Preferred Qualifications
- Master’s degree in Business, Engineering, or a related field
- PMP or equivalent project management certification
- Experience scaling up New Molecule Energetics
- Earned Value Management System (EVMS) experience
- Experience supporting capture, proposal development, or program growth initiatives
- Strong executive‑level communication and presentation experience
- Travel may be required to support manufacturing sites, suppliers, and customers.
KBR Benefits
KBR offers a selection of competitive lifestyle benefits which could include 401K plan with company match, medical, dental, vision, life insurance, AD&D, flexible spending account, disability, paid time off, or flexible work schedule. We support career advancement through professional training and development.
Belong, Connect and Grow at KBR
At KBR, we are passionate about our people and our Zero Harm culture. These inform all that we do and are at the heart of our commitment to, and ongoing journey toward being a People First company. That commitment is central to our team of team’s philosophy and fosters an environment where everyone can Belong, Connect and Grow. We Deliver – Together.
KBR is an equal opportunity employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, disability, sex, sexual orientation, gender identity or expression, age, national origin, veteran status, genetic information, union status and/or beliefs, or any other characteristic protected by federal, state, or local law.
Listed on hirly, a job board. hirly is not the employer: KBR is hiring for this role.
Similar jobs
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job