Naval Facilities Engineering Systems Command
CONSTRUCTION SCHEDULE ANALYST
Andersen Air Base, Guam, United States · Nimitz Hill, Guam, United States · Santa Rita, Guam, United States
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Matched against 2.6M live jobs from 210,000+ employers in 200+ countries.
Tailor my resume for this job →Apply from your AI assistant
Connect hirly to Claude or ChatGPT and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Mid level
- Stated salary
- $106,437 – $138,370 per year
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 20 Oct 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
Summary
This is a public notice flyer to notify interested applicants of anticipated vacancies. Applications will not be accepted through this flyer. Interested applicants must follow the directions in the "How to Apply" section of this flyer to be considered. There may or may not be actual vacancies filled from this flyer. Notice of Result letters will not be sent to applicants who respond to this flyer.
Duties
- You will provide assistance and technical guidance to engineers/ architects exercising management and administrative skills in leading the execution of Capital Improvements construction projects.
- You will provide support during the design phase of construction projects to ensure an appropriate construction duration is established for all MILCON, O/M Special (or equivalent), and large/complex NWCF projects.
- You will maintain historical and current CI metrics on schedule growth via use/modification of existing eContracts construction reports.
- You will provide recurring data analysis (minimally on a semi-annual basis) to CI Construction Product Line Coordinator/Manager along with recommendations to improve overall product line performance improvement
- You will provide testimony during Armed Services Board of Contract Appeals (ASBCA) or arbitration cases.
- You will possess a thorough understanding of scheduling requirements and supporting software to provide training for all CM (and Construction Engineering Technician, as applicable) community.
- You will participate on Construction Assist Visits to audit current field office operations for conformance to NAVFAC processes and effectiveness of field staff to manage schedule requirements.
Qualifications
Your resume must also demonstrate at least one year of Specialized experience at or equivalent to the GS-12 grade level or pay band in the Federal service or equivalent experience in the private or public sector. Specialized experience must demonstrate the following: - Experience providing technical guidance and management support to engineers and architects executing diverse projects. - Experience establishing baseline construction durations for high-visibility MILCON projects; and - Experience conducting critical path schedule analysis, validating delay impacts, and reviewing contractor Time Impact Analysis proposals to establish the Government's position on liability. Experience refers to paid and unpaid experience, including volunteer work done through National Service programs (e.g., professional, philanthropic, religious, spiritual, community, student, social). Volunteer work helps build critical competencies, knowledge, and skills and can provide valuable training and experience that translates directly to paid employment.
Listed on hirly, a job board. hirly is not the employer: Naval Facilities Engineering Systems Command is hiring for this role.
Similar jobs
- Enterprise Schedule Analyst - Mid Job #942Allenintegratedsolutions · Springfield, Virginia, United StatesFirst seen yesterday
- NASA Missions Schedule Analyst- Remote (Spacecraft Exp. Desired)Cornelltechnicalservices · Hampton, Virginia, RemoteFirst seen 65d agoremote
- Senior Schedule AnalystTamayo Federal Solutions LLC · Norfolk, VAFirst seen 13d ago
- Project Schedule Analyst III, TS/SCICitjpl · JPL CampusFirst seen 31d ago
- Junior Cost and Schedule AnalystTesla Laboratories, Inc. · Merritt Island, FLFirst seen 40d ago
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job