Holder Construction
Construction Scheduler
Fort Wayne, IN
hirly Pro
Get in front of the people hiring at Holder Construction
- Reach the hiring manager at Holder Construction on LinkedIn, from your own account
- hirly applies to this job for you, with unlimited applications
- A resume and cover letter written for this job, unlimited
- The hiring manager and recruiter at Holder Construction, with contact details
$49 a month · ₹1,999 for 30 days in India · cancel any time
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Matched against 2.2M live jobs from 220,000+ employers in 200+ countries.
Tailor my resume for this job →Apply from your AI assistant
Connect hirly to Claude or ChatGPT and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Mid level
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 11 Sept 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
ABOUT US
Holder Construction is a nationally recognized leader in the construction industry, consistently ranked among the top firms on ENR’s Top 400 Contractors list. We are a performance-driven company that believes in rewarding excellence and investing in our people. Our structured career development program empowers associates to grow quickly into expanded roles and responsibilities based on merit. With operations throughout the United States, w e offer a highly competitive compensation and benefits package, including:
Annual bonus program
Paid time off
Health, dental, vision, and life insurance
401(k)-retirement plan
Night and swing shift differential pay for select roles
About the Role
We are looking for a Scheduler to join our Scheduling team on a project in Fort Wayne , IN. This is a full-time, in-person position.
Key Responsibilities
Build and manage baseline schedules using CPM best practices, including detailed WBS for schedules with 2,500+ activities.
Run weekly meetings to update construction schedules via job walks and superintendent live updates.
Create, maintain, and edit layouts in Primavera P6 to efficiently update schedules, generate reports, and analyze critical paths.
Identify variances from previous baselines and filter work by trades, time frames, or areas to create custom reports.
Resource-load baseline schedules to track earned value metrics and maintain cost and duration accuracy.
Create Time Impact Analysis (TIA) reports using historical data from CPM tools.
Use Excel to analyze large data sets and multiple schedules.
Interface directly with clients to address concerns and requests.
Manage mid-month and end-of-month deliverables, including .xer files, critical path reports, full schedules, 6-week look-ahead reports, and schedule narratives.
Mentor, train, and assist in the professional development of junior schedulers.
Qualifications
Required:
Preferably 5+ years of commercial construction management and/or scheduling experience.
Familiarity with the construction process to identify and discuss potential issues and suggest mitigations.
Ability to work with minimal supervision.
Outstanding written and verbal communication, interpersonal, and time management skills.
Experience coordinating schedule development and management with project supervision, owners, and subcontractors/vendors.
Ability to work collaboratively in a large team environment.
Preferred:
Experience mentoring and training junior schedulers.
#LI-DO1
Holder is committed to Equal Opportunity Employment (EOE).
Substance abuse testing and a background screening is a condition of employment and Holder Construction does not sponsor applicants for immigration status or benefits.
Listed on hirly, a job board. hirly is not the employer: Holder Construction is hiring for this role.
Similar jobs
- Construction SchedulerHoffman Construction Company · Boise, ID, United States; ID, United States; Hauser, ID, United States; Kuna, ID, United States; Lewiston Orchards, ID, United States; Moscow, ID, United States; Post Falls, ID, United StatesFirst seen today
- Data Center Construction SchedulerCoreweave · Livingston, NJ / New York, NY / Sunnyvale, CA / San Francisco, CA / Bellevue, WAFirst seen yesterday
- Construction Scheduler Jrmconstructionmanagementllc · Boca Raton, FLFirst seen 20d ago
- Construction SchedulerHoffman Construction Company · Boise, ID, United States; ID, United States; Hauser, ID, United States; Kuna, ID, United States; Lewiston Orchards, ID, United States; Moscow, ID, United States; Post Falls, ID, United StatesFirst seen 43d ago
- Construction Scheduler - Columbus, OHCmtsllc · Columbus, OhioFirst seen 49d ago
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job