Mullins Mechanical
Construction Scheduler-P6 (Onsite- Pampa, Texas)
Abernathy, TX · Amarillo, TX · Dallas, TX · Dallas-Fort Worth, TX · Fort Worth, TX · Garland, TX · Houston, TX · Oklahoma City, OK · Plainview, TX · San Antonio, TX · Waco,TX · Wichita Falls, TX
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Matched against 2.7M live jobs from 200,000+ employers in 200+ countries.
Tailor my resume for this job →Apply from your AI assistant
Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Mid level
- Country
- US
- Work mode
- Remote-friendly
- First seen by hirly
- 3 Oct 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
Mullins Mechanical is a leader in industrial and large commercial mechanical, plumbing, and HVAC construction projects across manufacturing facilities, automotive plants, chemical processing sites, data centers, warehouses, and other large industrial environments. As a self-performing specialty contractor, we deliver excellence in design-build solutions, process and utility piping, HVAC systems, plumbing, equipment installation and rigging, metal fabrication, plant maintenance, and relocation.
As our organization continues to grow, we are evolving our Project Controls & Scheduling department to better support scaling construction field operations. We are seeking an experienced and forward-thinking Construction Scheduler who will serve as a strategic partner to our project execution Teams.
Key Responsibilities
Construction Scheduler will work closely with our preconstruction, project management, and field teams as well as with subcontractors and owners’ representatives to aid in the development and management of project schedules to ensure the success of our projects.
Lead the development of detailed project schedules along with project teams’ input
Collect project progress and updating project status
Performing impact analysis for potential delays and changes
Work with the project management and field teams to help set project goals and analyze the status of the project
Analyze the schedules to determine duration and logic issues
Ability to manage schedules for multiple projects and/or more complex projects, larger in size
Provide guidance to less experienced members of the scheduling team
Perform other duties as assigned
Travel may be necessary depending on the project needs and location
Education - Skills - Knowledge - Qualifications & Experience:
Bachelors degree in Construction Management, Engineering, or related field is preferred
Minimum 3 years of experience in complex construction (Heavy Commercial, Data Centers, Industrial, Power Generation, Specialty Contractors, Heavy Civil)
Knowledge of critical path method of scheduling
Strong written and oral communication skills
Experience using CPM Primavera P6 scheduling software
Experience with ProCore, Bluebeam, Navisworks, REVIT preferred
Familiarity with claims prevention and analysis techniques strongly preferred
Ability to conduct constructability reviews for varying construction method/techniques during design or construction
Work Location : Preferred to work at Mullins Mechanical office located in Carrollton, Georgia. Will consider hybrid/remote for the right Leader.
Salary: Compensation commensurate with experience.
- Join Us
- Mullins Mechanical ranked #243 on the 2024 ENR Top Specialty Contractors list, #48 in the Nation and #5 in the Southeast among Firms in Mechanical. We’re proud to be one of the fastest growing privately held companies in America. We’re a self-performing specialty contractor specializing in design-build applications, HVAC systems, plumbing, process piping systems, boiler and chiller systems, equipment installation and rigging, plant relocation and maintenance, fire protection, and metal fabrication. Our projects are often in industrial and heavy commercial environments such as manufacturing facilities, automotive plants, chemical plants, distribution centers, warehouses, data centers, and other large facilities.
Listed on hirly, a job board. hirly is not the employer: Mullins Mechanical is hiring for this role.
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job