hirly

Worldwide Mission Critical LLC

Data Center Construction Assistant Project Manager

Dallas–Fort Worth Metroplex, TX

See how you match this job — and similar ones. Free.

Upload your resume and hirly scores it against this role at Worldwide Mission Critical LLC first, then against similar open jobs, and shows where you fit and why.

PDF or DOCX, up to 12MB. No sign-up to see your matches.

Get past the screening software and onto a recruiter's desk

hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.

  • Keywords matched to this posting
  • Fit score before you apply
  • Cover letter included

Matched against 2.6M live jobs from 190,000+ employers in 200+ countries.

Tailor my resume for this job →

Apply from your AI assistant

Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.

Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.

hirly's read of this role

Seniority
Lead / management
Country
US
Work mode
On-site / unstated
First seen by hirly
26 Sept 2026

Derived automatically from the posting. Upload your resume above to see how the role scores against it.

the posting

Description

Worldwide Mission Critical is a global owner’s representation and project management company dedicated to the mission-critical industry, helping companies deliver their data centers on time and?under?budget. Founded on the principle that the right team of experienced data center professionals will deliver great projects, our ability to provide oversight for all aspects of a project sets us apart.?

Summary

Assistant Project Manager (APM) will support the Owner’s Representative for mission critical data center construction projects. APM will assist in managing Owner’s design/engineering, procurement, and construction contractors. APM’s primary responsibilities include monitoring construction activities, tracking project budgets and schedules, supporting contract administration, assisting with documentation, and facilitating meetings.

Primary Responsibilities

  • Support the Owner’s representative in construction of data centers that meet or exceed industry standards.
  • Represent Owner in a professional and ethical manner at all times.
  • Assist in mitigating change orders and ensuring construction is undertaken properly, minimizing Owner’s risk.
  • Monitor contractor performance and deliverables per the construction agreement/contract.
  • Support monitoring of daily construction activities at the project site including scheduling of work and delivery of equipment & materials.
  • Assist in reviewing submittals, drawings, and reports during the project design phase to avoid potential construction issues.
  • Track construction progress and report on work status, budget status, and schedule status regularly to Project Manager and Owner.
  • Assist in managing contract processes and documents such as RFIs and change orders, preparing them for management review and approval.
  • Review, interpret, and provide feedback on contractor-provided documents under guidance of Project Manager.
  • Assist in reviewing and verifying Contractor progress billings.
  • Support monitoring of commissioning, quality assurance, and quality control work/reporting by contractor, coordinating internal/external engineering support as needed.
  • Assist Owner’s operations staff, asset manager, and O&M provider with field visits and document review in anticipation of project substantial completion and commercial operation date.
  • Support coordination of site tours for investors, utility representatives, etc.
  • Assist in initial evaluation of Contractor payment applications to ensure accuracy relative to actual project construction status.
  • Support cash flow forecasting and processing of payment requests.
  • Assist in contract/payment discussions with Contractor as needed.
  • Provide technical, clerical, and administrative support for production of RFPs.
  • Support due diligence tasks on new project opportunities and perform site assessments of potential projects under guidance.
  • Coordinate with and support Owner’s consultants as needed.

Requirements

Skills, Knowledge, Education and Experience

  • Education: High School Diploma/GED and 5+ years relevant work experience in construction/project coordination role or Bachelor’s degree and 2–5 years relevant work experience in construction/project coordination role.
  • Experience with construction documentation and basic contract administration.
  • Knowledge of related construction practices.
  • Experience in the mission critical environment desirable.
  • Strong general computing skills.
  • Proficiency in Excel, MSWord, MS Project, PowerPoint, and Outlook.
  • Excellent communication and interpersonal skills.
  • High levels of initiative, self-direction, and attention to detail.
  • Ability to support Project Manager in motivating Contractor and accomplishing Owner/project goals.
  • Capable of assisting in troubleshooting construction issues.
  • Ability to plan, organize, and track internal and external resources.
  • Willingness to take on responsibilities with a commitment to perform.
  • Flexibility to adhere to unique Owner requests.
  • Support meeting facilitation and action item tracking.
Original posting on Worldwide Mission Critical LLC's site ↗

Listed on hirly, a job board. hirly is not the employer: Worldwide Mission Critical LLC is hiring for this role.

Browse similar roles

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job