Data Center Construction – Mid - Senior Commissioning Project Manager

Charlest, SC

hirly Pro

Get in front of the people hiring at MGAC

  • Reach the hiring manager at MGAC on LinkedIn, from your own account
  • hirly applies to this job for you, with unlimited applications
  • A resume and cover letter written for this job, unlimited
  • The hiring manager and recruiter at MGAC, with contact details
Get Pro for this job →

$49 a month · ₹1,999 for 30 days in India · cancel any time

See how you match this job — and similar ones. Free.

Upload your resume and hirly scores it against this role at MGAC first, then against similar open jobs, and shows where you fit and why.

PDF or DOCX, up to 12MB. No sign-up to see your matches.

Get past the screening software and onto a recruiter's desk

hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.

  • Keywords matched to this posting
  • Fit score before you apply
  • Cover letter included

Matched against 2.8M live jobs from 220,000+ employers in 200+ countries.

Tailor my resume for this job →

Apply from your AI assistant

Connect hirly to Claude or ChatGPT and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending.

Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.

hirly's read of this role

Seniority
Lead / management
Country
US
Work mode
On-site / unstated
First seen by hirly
16 Oct 2026

Derived automatically from the posting. Upload your resume above to see how the role scores against it.

the posting

It’s an exciting time to join MGAC!

MGAC is a global boutique consultancy dedicated to managing and representing our clients’ best interests. Our success is rooted in hiring exceptional people who are driven to do challenging work with the unique blend of experience, integrity, creativity, and commitment that separates us from our competitors.

We have three simple goals: to do the most interesting and challenging work, to have fun working together, and to build a successful business in the process.

This position requires significant onsite presence in Charleston, SC with travel required based on project and client needs.

Unlock Your Potential

We're looking for candidates eager to lead complex mission-critical projects, influence project outcomes, and drive operational excellence across large-scale data center developments. Here's what will set you up for success at MGAC:

5+ years of experience in commissioning, construction management, mission-critical facilities, or data center infrastructure projects.

3+ years of experience managing commissioning teams, consultants, and multidisciplinary project stakeholders.

Bachelor’s degree in Engineering, Construction Management, Mechanical Engineering, Electrical Engineering, or a related technical field. Equivalent experience will be considered.

Extensive experience supporting hyperscale, colocation, enterprise, or mission-critical data center construction projects.

Experience leading Level 1-5 commissioning activities for complex MEP and critical infrastructure systems.

Strong knowledge of electrical distribution, UPS systems, generators, HVAC systems, controls, BMS, EPMS, SCADA, and integrated systems testing.

Excellent analytical, organizational, leadership, problem-solving, presentation, interpersonal, verbal, and written communication skills.

Proven ability to manage multiple projects simultaneously while balancing schedule, budget, risk, quality, and client expectations.

A collaborative leader who thrives in fast-paced environments and is passionate about delivering exceptional project outcomes.

What You'll Be Doing

MGAC's Critical Environments team manages some of the most complex and high-profile data center projects in the industry. As a trusted owner's representative, we help clients navigate technical challenges, mitigate risks, and ensure facilities are delivered ready for operations. As a Data Center Construction – Mid - Senior Commissioning Project Manager you will lead commissioning strategy and execution across large-scale mission-critical projects and serve as a key advisor to clients throughout the project lifecycle.

Commissioning Leadership

Lead and manage commissioning teams including Commissioning Managers, Engineers, Project Managers, and third-party commissioning partners.

Oversee commissioning activities across multiple concurrent data center construction projects.

Develop commissioning strategies, resource plans, project schedules, and execution methodologies.

Provide technical leadership throughout design, construction, testing, and turnover phases.

Mentor and develop team members while promoting a culture of quality, accountability, and safety.

Commissioning Program Delivery

Direct the full lifecycle of Level 1-5 commissioning activities.

Review and approve commissioning plans, scripts, procedures, reports, and turnover documentation.

Oversee equipment start-up, functional performance testing, integrated systems testing (IST), load bank testing, and operational readiness activities.

Develop and maintain commissioning logs, deficiency logs, equipment checklists, SOPs, MOPs, and project documentation.

Ensure consistency and compliance with company quality processes and commissioning standards.

Technical Oversight

Lead commissioning efforts for critical infrastructure systems, including:

Electrical distribution systems

Medium- and low-voltage power systems

UPS systems and battery plants

Standby generators and fuel systems

Chillers and cooling plants

CRAH and CRAC units

Building Management Systems (BMS)

EPMS and SCADA systems

Fire alarm and life safety systems

Emergency power systems

Review design documents, specifications, shop drawings, and equipment submittals for commissioning requirements.

Support troubleshooting, issue resolution, and deficiency management during testing and startup activities.

Verify testing results and ensure systems meet owner project requirements and operational objectives.

Client Relationship Management

Serve as a trusted advisor and primary commissioning lead for clients and project stakeholders.

Facilitate commissioning meetings, project reviews, and progress reporting.

Coordinate activities among contractors, consultants, vendors, equipment manufacturers, and owner representatives.

Proactively identify project risks and develop mitigation and recovery strategies.

Maintain the client's vision while ensuring successful project delivery.

Our Critical Environments project work continues to experience tremendous growth, with a robust pipeline of hyperscale, colocation, and mission-critical projects across North America.

Why Work With Us?

30+ years strong in North America and growing fast with a positive, energizing culture.

Consistently recognized as a Top Workplace with a true employee-first mindset.

Entrepreneurial spirit encouraged. Bring fresh ideas and exceed client expectations.

Global reach, yet agile and client-focused like a boutique firm.

Your voice matters. Flat structure, open doors, and recognition for your contributions.

Exposure to some of the most complex and innovative data center projects in the industry.

Strong work-life balance, generous PTO, and top-tier wellness benefits.

Beyond the Paycheck: Discover Our Benefits

Recognized as a Top Workplace for over a decade.

Vacation starts on day one. Accrue 3 weeks per year, plus a paid birthday off.

8 sick days and 9 paid holidays annually for full-time employees.

Competitive benefits that support both personal and professional growth.

Professional development opportunities and support for industry certifications.

Salary Range

$110,000-$160,000 per year (commensurate with experience)

The advertised salary range is intended as a general guideline and may vary based on factors such as experience, expertise, certifications, and location. This base salary does not reflect the full compensation package, which may include bonuses, a 401(k) match, and other benefits.

Original posting on MGAC's site ↗

Listed on hirly, a job board. hirly is not the employer: MGAC is hiring for this role.

Browse similar roles

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job