hirly

Jane Street

Data Center Construction Project Manager

New York, New York, United States

hirly Pro

Get in front of the people hiring at Jane Street

  • Reach the hiring manager at Jane Street on LinkedIn, from your own account
  • hirly applies to this job for you, with unlimited applications
  • A resume and cover letter written for this job, unlimited
  • The hiring manager and recruiter at Jane Street, with contact details
Get Pro for this job →

$49 a month · ₹1,999 for 30 days in India · cancel any time

See how you match this job — and similar ones. Free.

Upload your resume and hirly scores it against this role at Jane Street first, then against similar open jobs, and shows where you fit and why.

PDF or DOCX, up to 12MB. No sign-up to see your matches.

Get past the screening software and onto a recruiter's desk

hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.

  • Keywords matched to this posting
  • Fit score before you apply
  • Cover letter included

Matched against 2.8M live jobs from 220,000+ employers in 200+ countries.

Tailor my resume for this job →

Apply from your AI assistant

Connect hirly to Claude or ChatGPT and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending.

Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.

hirly's read of this role

Seniority
Lead / management
Country
US
Work mode
On-site / unstated
First seen by hirly
8 Sept 2026

Derived automatically from the posting. Upload your resume above to see how the role scores against it.

the posting

About the Position

We are looking for an experienced Construction Project Manager/Engineer to join a highly technical group responsible for designing, constructing, and operating our network of data centers.

In this role, you will be responsible for planning and overseeing multiple data center projects of varied capacities to ensure schedules and budgets are met. Projects are typically focused on end user fit out, in coordination with the landlord fit out, and you’ll be working to interweave these construction timelines.

Our team is highly collaborative in nature, spanning many internal departments and external vendors, contractors, consultants, and landlords. You’ll liaise between internal stakeholders, data center providers, and external consultants across multiple projects at once to ensure they run smoothly from the concept stage to completion.

About You

Have 7+ years of construction project management, project coordination, or superintendent experience in data center construction

Have a high level of experience in mechanical and electrical systems, including liquid-cooled data centers

Have extensive experience in procurement, contractor management, construction planning, and design oversight, including schedule development, quality control, workflow management, milestone tracking, risk management, long-lead material coordination, and collaboration with internal and external teams

Proven ability to deliver results no matter the task, with the solid technical experience to back it up

Motivated self-starter who can work independently and proactively follow up to close the loop on tasks and projects

Makes well-reasoned decisions backed by data

Excellent written and spoken communicator; able to describe detailed problems with brevity and accuracy

Creative, collaborative, and enthusiastic team player; eager to learn and take initiative

Organized with strong time management skills and able to prioritize tasks, solve problems, and meet deadlines across multiple projects without losing attention to detail

Having a project management or engineering degree is a plus

Having experience working with PlanGrid, Autodesk Build, Procore, Bluebeam, MS Project, AutoCAD, REVIT/BIM, and/or MS Office is a plus

Willing to travel 4-6 weeks per year

If you're a recruiting agency and want to partner with us, please reach out to [email protected] .

Original posting on Jane Street's site ↗

Listed on hirly, a job board. hirly is not the employer: Jane Street is hiring for this role.

Browse similar roles

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job