hirly

Worldwide Mission Critical LLC

Data Center Construction Project Manager

Little Rock, AR

hirly Pro

Get in front of the people hiring at Worldwide Mission Critical LLC

  • Reach the hiring manager at Worldwide Mission Critical LLC on LinkedIn, from your own account
  • hirly applies to this job for you, with unlimited applications
  • A resume and cover letter written for this job, unlimited
  • The hiring manager and recruiter at Worldwide Mission Critical LLC, with contact details
Get Pro for this job →

$49 a month · ₹1,999 for 30 days in India · cancel any time

See how you match this job — and similar ones. Free.

Upload your resume and hirly scores it against this role at Worldwide Mission Critical LLC first, then against similar open jobs, and shows where you fit and why.

PDF or DOCX, up to 12MB. No sign-up to see your matches.

Get past the screening software and onto a recruiter's desk

hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.

  • Keywords matched to this posting
  • Fit score before you apply
  • Cover letter included

Matched against 2.8M live jobs from 220,000+ employers in 200+ countries.

Tailor my resume for this job →

Apply from your AI assistant

Connect hirly to Claude or ChatGPT and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending.

Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.

hirly's read of this role

Seniority
Lead / management
Country
US
Work mode
On-site / unstated
First seen by hirly
26 Sept 2026

Derived automatically from the posting. Upload your resume above to see how the role scores against it.

the posting

Description

Worldwide Mission Critical is a global owner’s representation and project management company dedicated to the mission-critical industry, helping companies deliver their data centers on time and under budget. Founded on the principle that the right team of experienced data center professionals will deliver great projects, our ability to provide oversight for all aspects of a project sets us apart.

Summary

Project Manager (PM) will act as the Owner’s Representative for mission critical data center construction projects. PM will manage Owner’s design/engineering, procurement, and construction contractors. PM’s primary responsibilities include oversight of construction, project budget tracking, and keeping project on schedule, avoidance of change orders, ensuring construction quality, contracts administration and facilitating Owner’s meetings.

Primary Responsibilities

  • Act as Owner’s representative adding value to the construction of data centers that meet or exceed industry standards.
  • Represent Owner in a professional and ethical manner at all times.
  • Work to mitigate change orders and to ensure that construction is undertaken properly, and that Owner’s risk is minimized.
  • Ensure that contractors are performing and providing deliverables per the construction agreement/contract.
  • Monitor daily construction activities at the project site including scheduling of work and delivery of equipment & materials.
  • Review submittals, drawings, and reports during the project design phase to avoid potential issues in construction.
  • Monitor construction and report on work progress, budget status, and schedule status regularly to Owner and company leadership in verbal and report form.
  • Manage and finalize contract processes and documents such as RFI’s and change orders, preparing them for management review and approval.
  • Review, interpret, and provide feedback on contractor provided documents.
  • Review, verify, and approve Contractor progress billings.
  • Review all commissioning, quality assurance, and quality control work/reporting done by contractor. Coordinate internal/external engineering support as needed.
  • Work with Owner’s operations staff, asset manager, and O&M provider to facilitate field visits and document review in anticipation of project substantial completion and commercial operation date.
  • Represent Owner and coordinate site tours as needed for investors, utility representatives, etc.
  • Provide initial evaluation of all Contractor payment applications to ensure accuracy relative to actual project construction status.
  • Assist in cash flow forecasting and processing of payment requests.
  • Represent Owner in contract/payment discussions with Contractor.
  • Provide support for and/or lead construction contract negotiations.
  • Provide technical, clerical, and other support for production of RFP’s
  • Perform due diligence tasks on new project opportunities and perform site assessments of potential projects
  • Coordinate with and direct Owner’s consultants as needed.

Requirements

  • Education: High School Diploma/GED and 10+ years relevant work experience in construction/project management role OR Bachelor’s degree and 5+ years relevant work experience in construction/project management role.
  • Experience with construction contract administration.
  • Knowledge of related construction practices.
  • Experience in the mission critical environment desirable.
  • Strong general computing skills.
  • Strong proficiency in Excel, MSWord, MS Project, PowerPoint, and Outlook.
  • Excellent communication and interpersonal skills
  • High levels of initiative, self-direction, and attention to detail
  • Ability to motivate Contractor with solid communication skills and contract knowledge to accomplish Owner and project goals
  • Ability to direct the troubleshooting and resolution of highly complex or unusual construction problems
  • Capable of planning and organizing internal and external resources
  • Willingness to take on responsibilities with a commitment to perform
  • Flexibility to adhere to unique Owner requests
  • Meeting facilitation and action item tracking
Original posting on Worldwide Mission Critical LLC's site ↗

Listed on hirly, a job board. hirly is not the employer: Worldwide Mission Critical LLC is hiring for this role.

Browse similar roles

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job