hirly

KP Group

Deputy Manager

surat, India

Apply through hirly

Upload your resume and get a version tailored to this job, plus a cover letter, in about thirty seconds — before you create an account.

Apply with hirly

hirly's read of this role

Seniority
Lead / management
Country
IN
Work mode
On-site / unstated
First seen by hirly
23 Sept 2026

Derived automatically from the posting. Sign up to see how the role scores against your own resume.

the posting

Job Description (JD)

Title: SCADA Execution Head – Solar/Wind/Substation Projects

Location: Site Based- (Base Location: Bharuch, need to travel- PAN INDIA as per Business requirement)

Industry: Renewable Energy – Solar/Wind

Experience: 10–20 Years

Role Overview:

Experienced SCADA Execution Head to lead end-to-end SCADA/PPC/SAS/Telemetry system execution for large-scale solar projects connected to STU & CTU substations . The candidate will be responsible for design coordination, execution, testing, commissioning, and compliance with grid connectivity requirements.

Key Responsibilities:

  • Lead complete SCADA/PPC/SAS/Telemetry system execution for utility-scale solar projects connected to State Transmission Utility (STU) / Central Transmission Utility of India Limited (CTUL) substations.
  • Ensure compliance with Central Electricity Authority (CEA) regulations and grid connectivity standards.
  • Coordinate with SLDC/RLDC/NLDC for telemetry, real-time data integration, and grid synchronization approvals.
  • Manage SCADA architecture including:
  • Data loggers
  • RTUs
  • PPC (Power Plant Controller)
  • Weather monitoring systems
  • String/central inverter communication
  • Interface with OEMs, EPC teams, protection & control teams, and STU/CTU substation authorities.
  • Ensure proper integration with SAS (Substation Automation System).
  • Lead FAT, SAT, and end-to-end commissioning activities.
  • Review communication protocols (IEC 60870-5-104, Modbus, OPC, IEC 61850).
  • Ensure cybersecurity compliance as per grid requirements.
  • Monitor project timelines, resource allocation, and execution quality.
  • Handle troubleshooting during commissioning and post-synchronization.
  • Prepare documentation including:
  • SLD inputs
  • Communication architecture drawings
  • Telemetry point list
  • Approval documents

Technical Requirements:

  • Strong knowledge of:
  • STU/CTU connectivity procedures
  • SCADA & PPC integration
  • Grid code compliance
  • SAS systems
  • Experience in projects connected to ISTS network.
  • Hands-on experience in telemetry approval from RLDC.
  • Knowledge of protection relay integration & disturbance recorder data.
  • Familiarity with remote monitoring platforms and cybersecurity frameworks.

Qualification:

  • B.E./B.Tech in Electrical / Electronics / Instrumentation Engineering.
  • Minimum 10+ years of experience in Solar/Wind SCADA execution.
  • Experience handling ≥100 MW utility-scale projects preferred.

Leadership & Soft Skills:

  • Team Leader
  • Strong stakeholder management skills.
  • Ability to coordinate with STU, CTU, RLDC, OEMs, and EPC partners.
  • Excellent problem-solving and decision-making ability.
  • Willingness to travel and work at project sites.

Preferred Experience:

  • Experience in large ISTS-connected solar parks.
  • Prior experience in SCADA integration at 220kV / 400kV substations.
  • Exposure to hybrid (Solar + BESS) projects will be an added advantage.
Original posting on KP Group's site ↗

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job
Deputy Manager at KP Group, surat · Apply with a tailored resume