Fermi LLC
Director, Data Center Construction
TX
hirly Pro
Get in front of the people hiring at Fermi LLC
- Reach the hiring manager at Fermi LLC on LinkedIn, from your own account
- hirly applies to this job for you, with unlimited applications
- A resume and cover letter written for this job, unlimited
- The hiring manager and recruiter at Fermi LLC, with contact details
$49 a month · ₹1,999 for 30 days in India · cancel any time
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Matched against 2.1M live jobs from 220,000+ employers in 190+ countries.
Tailor my resume for this job →Apply from your AI assistant
Connect hirly to Claude or ChatGPT and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Director
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 20 Oct 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
Description
Role Overview
Fermi America is seeking a Director of Data Center Construction to lead owner’s representation and field execution oversight for Fermi’s hyperscale data center program. This role will serve as the primary interface between Fermi, the general contractor, and the tenant’s onsite leadership team—including project executives, construction managers, and commissioning leads—ensuring construction delivery aligns with quality standards, schedule commitments, and budget targets across a multi-building, multiphase campus environment.
The Director of Data Center Construction will build and lead a team of data center project managers responsible for shell, core, and site-work execution. This is a high-visibility leadership role requiring deep experience managing large-scale construction programs in mission-critical or hyperscale data center environments, along with a strong command of GMP and EPC contract structures, field operations, and subcontractor management.
The role works closely with senior leadership and partners across preconstruction, design integration, technical management, project controls, procurement, safety, quality, and commissioning. Operating in a highly matrixed environment, success will depend as much on influence and partnership as on direct authority. The right leader will build strong, collaborative relationships across every function and foster a culture of transparency, shared accountability, and mutual respect.
Key Responsibilities
Serve as the owner’s representative to both the general contractor and the tenant’s onsite leadership team for all data center construction activities, ensuring field execution meets Fermi’s standards for quality, safety, schedule, and cost
Lead and manage a team of DC project managers across concurrent building phases, from site mobilization through substantial completion and turnover
Drive accountability for construction milestones, progress tracking, and schedule adherence across shell, core, MEP rough-in, and building enclosure scopes
Own the relationship with the GC and the tenant’s onsite leadership team at the program level—including project executives, construction managers, and commissioning leads—managing escalations, resolving disputes, and ensuring alignment on priorities, sequencing, and resource loading
Oversee GMP and construction contract administration, including change order management, pay application review, and scope validation
Coordinate with the Sr DC Design Integration Manager and engineering teams to ensure design packages are construction-ready and field issues are resolved without schedule impact
Establish and enforce field quality standards, safety protocols, and inspection programs in partnership with QA/QC and HSE leadership
Implement earned value and progress measurement systems to provide real-time visibility into construction performance across all active buildings
Partner with the Sr DC Preconstruction Manager to ensure smooth transitions from preconstruction into active construction phases
Support commissioning readiness by coordinating construction completion milestones with MEP integration and IT load delivery timelines
Drive continuous improvement in construction delivery—identifying lessons learned, standardizing processes, and reducing cycle times across successive building phases
Build and sustain a strong, collaborative culture across the DC delivery organization—fostering open communication, mutual accountability, and trust with procurement, safety, quality, design, and project controls partners to ensure alignment and shared ownership of delivery outcomes
AI-Enabled Execution Philosophy
Fermi America integrates artificial intelligence and advanced analytics into its core project delivery workflows. The Director of DC Construction will be expected to embrace and champion this philosophy, including:
Leveraging AI-powered schedule analysis tools to identify critical path risks, forecast delays, and optimize construction sequencing across concurrent building phases
Utilizing predictive analytics for earned value tracking, resource loading optimization, and early warning detection on cost and schedule variances
Partnering with project controls to deploy AI-driven reporting dashboards that provide real-time field progress visibility to leadership
Encouraging adoption of AI-assisted document review for RFIs, submittals, change orders, and daily field reports to accelerate decision-making and reduce administrative burden
Supporting the development of digital twin and BIM integration workflows that connect design intent to field execution in real time
Fostering a culture of continuous learning where AI tools augment field team capabilities rather than replace human judgment and craft expertise
Requirements
Relevant Experience
18+ years of progressive construction management experience, with a minimum of 10 years in hyperscale data center, mission-critical facility, or large-scale industrial construction programs
Demonstrated experience serving as an owner’s representative or senior construction lead managing general contractors on multi-billion-dollar construction programs
Strong command of GMP, lump-sum, and EPC contract structures, including change order negotiation, claims management, and pay application oversight
Track record of managing concurrent multi-building construction programs with peak craft workforces exceeding 1,000 personnel
Deep understanding of data center construction sequencing—shell/core, MEP rough-in, critical power, cooling systems, and IT infrastructure fit-out
Experience with earned value management systems, construction scheduling in Primavera P6, and field progress tracking methodologies
Strong safety leadership with demonstrated commitment to zero-incident culture on large construction sites
Excellent communication and stakeholder management skills, with a demonstrated ability to build collaborative, high-trust relationships across technical, commercial, and executive audiences—including tenant onsite leadership, contractors, and cross-functional internal teams. Proven ability to operate effectively in a matrix organization where influence, alignment, and partnership are as important as direct authority
Bachelor’s degree in Construction Management, Civil Engineering, Mechanical Engineering, or related field; advanced degree or PMP certification preferred
Preferred Qualifications
Direct experience with hyperscale data center programs for major technology companies (e.g., Google, Meta, Microsoft, AWS, Oracle) or leading data center developers
Familiarity with modular and prefabricated construction methods and their application in accelerating data center delivery timelines
Experience operating in greenfield campus environments with complex site infrastructure interdependencies
Working knowledge of Uptime Institute Tier III/IV design and construction standards
Comfort operating in a high-growth, fast-moving organization where the role will help define processes and standards as the platform scales
Work Requirements
This is a 100% onsite role based at Fermi's campus in Amarillo with periodic visits to vendor facilities, fabrication shops, and partner offices
Ability to work on active construction sites, including walking job sites, climbing ladders, and navigating unfinished structures in varying weather conditions
Willingness to wear required personal protective equipment (PPE) including hard hat, safety glasses, high-visibility vest, steel-toe boots, and hearing protection when on-site
Flexibility to work extended hours during critical construction milestones, commissioning events, or schedule recovery efforts as needed
Why This Role Matters
As Fermi moves from development into large-scale data center delivery, the company needs a senior construction leader who can hold the general contractor accounta
Listed on hirly, a job board. hirly is not the employer: Fermi LLC is hiring for this role.
Similar jobs
- Director, E-Commerce Label & Artist ServicesWmg · USA - Los Angeles - 777 S. Santa Fe AveFirst seen today
- Senior Director, Catalog Acquisitions & Deal OriginationWmg · 2 LocationsFirst seen today
- Director, Operational ExcellenceVrtx · Boston, MAFirst seen today
- Senior Director, GCS — Rare Endocrinology - PalsonifyVrtx · Boston, MAFirst seen today
- Director, Emergency DepartmentValleyhealth · The Valley Hospital-ParamusFirst seen today
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job