CACI
Earned Value Program Control Analyst
Denver, CO, US · Sterling, VA, US
hirly Pro
Get in front of the people hiring at CACI
- Reach the hiring manager at CACI on LinkedIn, from your own account
- hirly applies to this job for you, with unlimited applications
- A resume and cover letter written for this job, unlimited
- The hiring manager and recruiter at CACI, with contact details
$49 a month · ₹1,999 for 30 days in India · cancel any time
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Matched against 3M live jobs from 220,000+ employers in 200+ countries.
Tailor my resume for this job →Apply from your AI assistant
Connect hirly to Claude or ChatGPT and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Mid level
- Stated salary
- $82,100 – $172,400 per year
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 22 Sept 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
Job Title: Earned Value Program Control Analyst
Job Category: Project and Program Management
Time Type: Full time
Minimum Clearance Required to Start: TS/SCI
Employee Type: Regular
Percentage of Travel Required: Up to 25%
Type of Travel: Continental US
Anticipated Posting End: 10/30/2026
The Opportunity:
The candidate will work on site along with other Program Management Office (PMO) personnel. Working under the direction of the Program Manager, the Program Management Office is responsible for executing CACI’s Earned Value Management System (EVMS), maintaining the program’s Integrated Master Schedule, monitoring invoices and projecting expenditures, proposing and executing contract modifications, and forecasting and reporting the program’s cost/schedule/performance status to both the customer and CACI executives. Successful candidates will analyze historical program performance, monitor the forecasted completion data, interface directly with the customer's on-site personnel, and support recommendations made to the CACI executives, Program Managers, and Control Account Managers.
- Reasonabilities:
- - Provide on-site project and earned value management support and coordination
- - Assist with the development of the program's cost and schedule baseline
- - Assist with the review and reporting of performance updates from the program’s Control Account Managers
- - Support senior EV Analysts as they brief Government personnel regarding EVM and schedule performance
- - Monitor ongoing procedures (e.g., Baseline Change Requests (BCRs), Schedule Management, Variance Analysis) for efficiency/effectiveness, and coordinate with program control teams to implement process improvements
- - Assist the program to develop program-specific standards and process instructions for planning, scheduling, baseline control, EVMS, financial controls, subcontract cost integration, and Integrated Program Management Report (IPMDAR) compilation and analysis
- - Assist the program to develop the program's cost and schedule baseline to be presented at formal Integrated Baseline Reviews (IBRs) with the Government
- - Assist with the transfer of data from the team’s Integrated Master Schedule to the team’s Earned Value system and validate data accuracy.
- - Develop and maintain EV artifacts and other program documentation related to ad hoc deliverables to the customer and to CACI leadership, as well as evidence to present during quarterly DoD surveillance audits
- Qualifications:
- Required:
- - Active TS/SCI clearance
- - Established and productive professional individual contributor
- - Ability to work independently with general supervision
- - Basic knowledge of Earned Value definitions and calculations
- - Ability to analyze and determine a resolution for problems/questions that may be challenging but typically not complex
- - Ensure compliance with internal procedures and government cost/schedule reporting regulations
- - Perform non-routine analysis and prepare non-routine performance reports
- - Strong organizational skills and attention to detail
- - Skilled in Microsoft Excel
- - Proficiency with other MS Office products (Outlook, Word, Power Point, Project, Visio and SharePoint)
- - Bachelor's degree in a quantitative discipline (e.g., economics, engineering, mathematics, operations research, statistics or business) or a discipline that fosters problem solving, structured analysis and creativity
- - On-the-job and formal training will be provided to motivated candidates who have the desire to expand their skills and apply their knowledge to improve the team’s overall performance
- Desired:
- - Working knowledge of Earned Value definitions and calculations
- - Experience with Program Control software such as Deltek COBRA, EMPOWER,SSI Tools or Microsoft Project
- - Familiarity with DoD Contracting environment
- - Experience with corporate finance procedures
- - Experience with formulating forecast models using historical information to estimate future cost/performance
-
What You Can Expect:
A culture of integrity.
At CACI, we place character and innovation at the center of everything we do. As a valued team member, you’ll be part of a high-performing group dedicated to our customer’s missions and driven by a higher purpose – to ensure the safety of our nation.
An environment of trust.
CACI values the unique contributions that every employee brings to our company and our customers - every day. You’ll have the autonomy to take the time you need through a unique flexible time off benefit and have access to robust learning resources to make your ambitions a reality.
A focus on continuous growth.
Together, we will advance our nation's most critical missions, build on our lengthy track record of business success, and find opportunities to break new ground — in your career and in our legacy.
Pay Range :
There are a host of factors that can influence final salary including, but not limited to, geographic location, Federal Government contract labor categories and contract wage rates, relevant prior work experience, specific skills and competencies, education, and certifications. Our employees value the flexibility at CACI that allows them to balance quality work and their personal lives. We offer competitive compensation, benefits and learning and development opportunities. Our broad and competitive mix of benefits options is designed to support and protect employees and their families. At CACI, you will receive comprehensive benefits such as; healthcare, wellness, financial, retirement, family support, continuing education, and time off benefits.
Since this position can be worked in more than one location, the range shown is the national average for the position.
The proposed salary range for this position is:
$82,100-$172,400
CACI is an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, pregnancy, sexual orientation, age, national origin, disability, status as a protected veteran, or any other protected characteristic.
Listed on hirly, a job board. hirly is not the employer: CACI is hiring for this role.
Similar jobs
- Quality Control Analyst (Reference Standards)Regeneron · 2 LocationsFirst seen 4d ago
- Program Cost Control Analyst - Level 3Ngc · United States-California-Redondo BeachFirst seen 2d ago
- Program Cost Control AnalystNgc · 3 LocationsFirst seen 2d ago
- Quality Control Analyst II - Environmental MonitoringLonza · US - Houston, TXFirst seen 3d ago
- Inventory Control AnalystGalderma · MiamiFirst seen 3d ago
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job