hirly

Oracle

Lead Principal Physical Security Engineer, Hyperscale Data Center Construction (Shackleford County, TX)

TX, United States

See how you match this job — and similar ones. Free.

Upload your resume and hirly scores it against this role at Oracle first, then against similar open jobs, and shows where you fit and why.

PDF or DOCX, up to 12MB. No sign-up to see your matches.

Get past the screening software and onto a recruiter's desk

hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.

  • Keywords matched to this posting
  • Fit score before you apply
  • Cover letter included
Tailor my resume for this job →

Apply from your AI assistant

Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.

Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.

hirly's read of this role

Role family
Engineering
Seniority
Lead / management
Country
US
Work mode
On-site / unstated
First seen by hirly
16 Oct 2026

Derived automatically from the posting. Upload your resume above to see how the role scores against it.

the posting

Oracle publishes the full text of this posting on its own careers page.

Read the full posting ↗

Listed on hirly, a job board. hirly is not the employer: Oracle is hiring for this role.

Browse similar roles

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job