Villeroy & Boch
Manager Laboratory
Saraburi
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Matched against 2.6M live jobs from 210,000+ employers in 200+ countries.
Tailor my resume for this job →Apply from your AI assistant
Connect hirly to Claude or ChatGPT and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Lead / management
- Country
- TH
- Work mode
- On-site / unstated
- First seen by hirly
- 4 Nov 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
Shape & Create - And make it happen!
Managing, controlling, organizing and monitoring the quality of slip and glaze, plaster, and repair raw material from Supplier and ceramic product in process including performing all necessary inspection and laboratory research to provide for the compliance with all standards and requirements of the company before the materials are delivered to the production.
Overall planning of the raw material stock; organizing and supporting the operations of the slip and glaze preparation units in order to ensure the most effective return on assets in the overall production process.
Co-operating and interfacing with the management of all departments of V&B Thailand (most of all production) and the headquarters in Mettlach in order to follow the company’s production strategies, production management concepts and production yield requirements.
Conducting research and development activities for slip, glaze, plaster and repair material including project assignment.
Ensuring efficient collaboration and co-ordination between the relevant departments including the cast shop, glazing department and procurement.
Supervising and managing the staff of department, providing all necessary assistance and guidance and making sure that the turnover and overtime rates are kept in the limits allowed by company standards.
Think outside the box with us! #shapeandcreate
Listed on hirly, a job board. hirly is not the employer: Villeroy & Boch is hiring for this role.
Similar jobs
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job