hirly

Nscale

Manager, Preconstruction Scheduling

US

See how you match this job — and similar ones. Free.

Upload your resume and hirly scores it against this role at Nscale first, then against similar open jobs, and shows where you fit and why.

PDF or DOCX, up to 12MB. No sign-up to see your matches.

Get past the screening software and onto a recruiter's desk

hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.

  • Keywords matched to this posting
  • Fit score before you apply
  • Cover letter included

Matched against 2.7M live jobs from 200,000+ employers in 200+ countries.

Tailor my resume for this job →

Apply from your AI assistant

Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.

Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.

hirly's read of this role

Seniority
Lead / management
Stated salary
$120,000 – $180,000 per year
Country
US
Work mode
On-site / unstated
First seen by hirly
3 Oct 2026

Derived automatically from the posting. Upload your resume above to see how the role scores against it.

the posting

ROLE OVERVIEW

Nscale is seeking a Manager, Preconstruction Scheduling to lead project schedule development at a campus level for new builds across the company portfolio. Reporting to the Director, Preconstruction Scheduling, you will provide professional scheduling capabilities that directly enable Nscale's speed to market.

You will be responsible for creating integrated delivery schedules throughout the development lifecycle, incorporating inputs from multiple workstreams, running schedule variance analysis, and translating complex project constraints into clear, actionable schedule frameworks.

SCHEDULE DEVELOPMENT & MANAGEMENT

Develop and manage the Preconstruction Schedules, responsible for generation, maintenance, and publication of project-specific integrated delivery schedules and supporting basis of schedule documents across the active portfolio

Develop conceptual and detailed schedules for multiple user groups including New Site Development, Construction, Energy, AI Infrastructure, Design and Procurement

Review external Prime Contractor, Power & Utility, Design, Subcontractor, and Procurement schedules throughout the planning phase of the project lifecycle

Integrate internal and external workstream fragnet schedules into a single cohesive integrated delivery schedule

Define activities and associated scope, duration, logic, interface, and resource loading

Investigate and incorporate project constraints — site, market, and regulatory — into the planning effort

RISK & ANALYSIS

Create, review, and analyze critical path schedules independently, efficiently, and comprehensively

Develop schedule variance analysis, including Monte Carlo and other risk analysis scenarios

Work with peer groups to incorporate feedback on product, market, and site-specific factors to create detailed due diligence schedules supporting land acquisition, leasing, and major capital expenditure

Iterate on project development scenarios and communicate tradeoffs through verbal, written, and graphical means appropriate to project goals

PROCESS & STANDARDS

Provide input on policies and procedures for scheduling in coordination with peer departments

Support the development of P6 cloud training guidelines and roll out to teams

Apply principles of cost estimating and productivity in establishing schedule parameters (duration, resource loading, etc.)

Develop data analysis for development schedules and issue management reports per project procedures

Ensure consistency of updates and reporting. Your project data will directly input into NA-ELT facing dashboards, reporting, and publications to support leasing, commercial negotiations, and project status updates

Drive continuous improvement to scheduling business processes in collaboration with vertical peers

QUALIFICATIONS

Bachelor's Degree in Construction Management or a relevant functional discipline, or equivalent combination of education and experience

6+ years of related work experience in construction scheduling

Data center or mission-critical facility experience strongly preferred

Strong theoretical and applied understanding of the Critical Path Method (CPM) of scheduling

Expert knowledge of Primavera P6 (latest version) and MS Project

Extensive experience with ProCore and PowerBI strongly preferred

Experience creating schedule risk matrices and applying risks via Monte Carlo analysis preferred

Ability to understand and accurately interpret construction documents — drawings, specifications, and contracts — at all design levels

Proficiency in Microsoft Office tools including Excel, PowerPoint, SharePoint, and Word

Willingness to travel up to 20% based on business needs

The range below reflects the base salary for the position. Actual compensation may vary based on job-related factors such as skill set, experience, education, and location. In addition to base salary, this role may be eligible for bonus, equity, and/or commission programs. Nscale may offer a competitive benefits package including medical, dental, vision, flexible paid time off, parental leave, and retirement plan participation.

Salary Range

$120,000 — $180,000 USD

For information on how Nscale handles candidate personal data, please see our Employee & Candidate Privacy Notice: Here.

Nscale does not accept unsolicited candidate submissions from recruitment agencies.

Original posting on Nscale's site ↗

Listed on hirly, a job board. hirly is not the employer: Nscale is hiring for this role.

Browse similar roles

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job