Broadpin
Oracle Primavera Technical Consultant - Home based in India
India
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Apply from your AI assistant
Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Mid level
- Country
- IN
- Work mode
- On-site / unstated
- First seen by hirly
- 25 Oct 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
Overview: Project Partners, LLC (DBA Broadpin), namely Project Experts India Pvt. Ltd., is currently seeking a candidate with an Oracle Primavera background to join our highly experienced team of Primavera Solution Engineers. This position is for the Indian subsidiary of Project Partners, LLC (DBA Broadpin), namely Project Experts India Pvt. Ltd. Is a long-standing in Oracle ERP, Oracle Cloud, and industry-specific solutions, we deliver customer-focused consulting, strategic implementation, and…
Listed on hirly, a job board. hirly is not the employer: Broadpin is hiring for this role.
Similar jobs
- Linux Technical Consultant (0-30days, KVM experience mandatory)Neev Pvt Ltd · IndiaFirst seen today
- AEM Technical Consultant (100% Remote) (India & EMEA)Allshore Talent · IndiaFirst seen 6d agoremote
- MSD_Lead Technical ConsultantPerficient · IndiaFirst seen 9d ago
- JDE Enterprise One Technical ConsultantProgrammers.ai · Jaipur, Rajasthan, IndiaFirst seen today
- Senior Technical Consultant - Network CloudThinkahead · IndiaFirst seen todayremote
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job