AEP
Project Scheduler (Maintenance Electrical)
Bridgman, MI
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Apply from your AI assistant
Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Mid level
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 7 Oct 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
Job Posting End Date
10-21-2026 Please note the job posting will close on the day before the posting end date.
Job Summary
Please Note: This position is posted in a range, and an offer will be made based on the candidate's qualifications.
This role will be responsible for coordinating scope of work team activities and supporting the Project Managers (PMs). with some supervision, perform functions of as scheduler and/or commodity tracker for major projects. Develop, maintain & analyze less complex scope of work schedules using the assigned system. Develop and analyze scope of work schedules using assigned systems. Provide integrated cost loaded, resource loaded, and logic driven schedules, as applicable. Perform schedule maintenance, collecting progress data, developing and implementing scope of work schedule/status reports, and providing consistent, accurate information to the scope of work execution team.
Job Description
- Define activities, durations, work sequences, and relationship logic to develop the scope of work plan and develop milestones to represent key decisions and deliverables that take place during execution.
- Ensure all scope and deliverables are accounted for.
- Develop, maintain, and analyze scope of work project schedules using the assigned system (Primavera, SmartSheet, etc.).
- Organize and lead schedule review meetings with all stakeholders and incorporate appropriate details.
- Ensure clear minutes and action items, as required.
- Engage team and stakeholders to create schedules and provide schedule analysis updates to team, alerting them to schedule risks and issues that could delay milestones.
- Communicate schedule status to project stakeholders.
- Understand the AEP project management organizational standards and assist in the management of projects to those standards.
- Adhere to the guidance and standards put forth by the AEP Project Management Governance Committee.
- Work with Administrator to assign security, profiles, and roles for new users.
- Learn, use, and refine sound techniques and best practices to update progress, acquire information, baseline schedules, maintain schedules, develop commodity curves, track metrics, and support project/outage teams on a routine basis.
- Provide periodic summary level status reports as requested.
- Prepare and analyze metrics reports or Key Performance Indicators (KPIs).
What We're Looking For:
Project Scheduler:
- With a High School Diploma or GED, 5 years' experience as a Project Scheduler Associate.
- With a qualified Associate's degree, 3 years' qualified experience.
- With a qualified Bachelor's degree, 1 year of qualified experience.
- Qualified degrees must be in a related field from an accredited university or college and could include Accounting, Business, Construction Management, Engineering, Technology, or Project Management.
Experience:
- Qualified experience includes utility specific operations knowledge/experience with a good working knowledge of work processes and procedures.
- Experience should be in design, operations, planning, project management, cost tracking analysis, forecasting, project budgets, working with accounting principles, and/or construction or maintenance of systems and/or equipment.
License/Certifications:
- A professional or trade certification such as a CCMP, CETa, IQCP, PMP, RMP, etc. is not required at this level.
- A certification is required to progress to the principal level of this job family if you have a high school diploma/GED or non-qualified higher education degree. Otherwise, a certification is preferred at the principal level.
Project Scheduler, Sr:
Education:
- Education requirement is dependent upon experience as indicated below. Qualified degrees must be in a related field from an accredited university or college and could include Accounting, Business, Construction Management, Engineering, Technology, or Project Management.
- With a High School Diploma or GED, 6 years' qualified experience. (Note: For Cook Nuclear Plant, 6 years of nuclear experience will suffice and a professional or trade certification is not required).
- With a qualified Associate's degree, 4 years' qualified experience.
- With a qualified Bachelor's degree, 2 years' qualified experience required.
Experience:
- Qualified experience includes utility specific operations knowledge/experience with a good working knowledge of work processes and procedures.
- Experience should be in design, operations, planning, project management, cost tracking analysis, forecasting, project budgets, working with accounting principles, and/or construction or maintenance of systems and/or equipment.
License/Certifications:
A professional or trade certification such as a CCMP, CETa, IQCP, PMP, RMP, etc. is not required at this level. A certification is required to progress to the principal level of this job family if you have a high school diploma/GED or non-qualified higher education degree. Otherwise, a certification is preferred at the principal level.
Project Scheduler, Principal:
Education:
- Education requirement is dependent upon experience as indicated below. Qualified degrees must be in a related field from an accredited university or college and could include Accounting, Business, Construction Management, Engineering, Technology, or Project Management.
- With a High School Diploma or GED, 7 years' qualified experience (Note: For Cook Nuclear Plant, 7 years of nuclear experience will suffice and a professional or trade certification is not required).
- With a qualified Associate's degree, 5 years' qualified experience.
- With a qualified Bachelor's degree, 3 years' qualified experience required.
Experience:
Qualified experience includes utility specific operations knowledge/experience with a good working knowledge of work processes and procedures. Experience should be in design, operations, planning, project management, cost tracking analysis, forecasting, project budgets, working with accounting principles, and/or construction or maintenance of systems and/or equipment.
Other Requirements:
- Demonstrate ability to manage time effectively and efficiently; show capacity for organizational and planning skills; as well as having an aptitude for accuracy, attention to detail, and ability to achieve goals.
- Strong written and verbal communication skills.
- Team player with ability to work and collaborate well with others.
- Immediate knowledge of Microsoft Office tools and ability to develop complex spreadsheets.
- Some travel, including overnight, may be required. On rare occasions, temporary relocation might be required to complete work.
- Must be a self-motivated individual and able to work under general supervision, be independent, and competently perform current scheduling techniques and analyses on all scope of work aspects.
- Safely and effectively perform light physical duties at various work sites including home and AEP locations in varying conditions.
- Understand and support the policies, values, principles, structure and behavior of AEP.
- For nuclear positions, work performed at nuclear power sites may involve work in hazardous areas and possible radiation exposure within the limits prescribed by the NRC.
- As applicable based on role and site, duties can involve construction site walkdown on unstable surfaces, climbing ladders, and awareness of hazardous site conditions, as applicable.
- Mut have a permanent residence within a 45-minute safe drive to the Cook Nuclear Plant.
Must establish & maintain a permanent residence within a 45-minute safe driving distance to the D.C. Cook Nuclear Plant.
What You'll Get:
In addition to competitive compensation, AEP offers a unique comprehensive benefits package that aims to support and enhance the overall well-being of our employees.
The power of AEP comes from our valued team of unique employees...the best in the business! We're proud to be one of the largest electric energy companies in
Listed on hirly, a job board. hirly is not the employer: AEP is hiring for this role.
Similar jobs
- Project SchedulerClunegc · San Francisco, CAFirst seen today
- Project SchedulerEvs · 2 LocationsFirst seen today
- Project SchedulerClark · Houston, TXFirst seen today
- Project SchedulerVertiv · Greenville, SC, United StatesFirst seen yesterday
- Construction Project SchedulerPae · US-ID-ScovilleFirst seen yesterday
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job