Mortenson
Safety Engineer - Data Center Construction
Amarillo, TX, United States
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Apply from your AI assistant
Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Mid level
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 21 Oct 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
Mortenson publishes the full text of this posting on its own careers page.
Read the full posting ↗Listed on hirly, a job board. hirly is not the employer: Mortenson is hiring for this role.
Similar jobs
- Safety EngineerClark · Richmond, VAFirst seen yesterday
- Systems and OSHA Safety EngineerCaci · Colorado Springs, CO, USFirst seen yesterday
- Associate or Experienced Aerospace Systems Safety EngineerBoeing · 2 LocationsFirst seen yesterday
- Mid-level Software Safety EngineerLeidos · Huntsville, ALFirst seen yesterday
- Safety EngineerAbbott · United States - Texas - IrvingFirst seen yesterday
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job