hirly

Galaxydigitalservices

Senior Manager, Data Center Construction

Afton, Texas

hirly Pro

Get in front of the people hiring at Galaxydigitalservices

  • Reach the hiring manager at Galaxydigitalservices on LinkedIn, from your own account
  • hirly applies to this job for you, with unlimited applications
  • A resume and cover letter written for this job, unlimited
  • The hiring manager and recruiter at Galaxydigitalservices, with contact details
Get Pro for this job →

$49 a month · ₹1,999 for 30 days in India · cancel any time

See how you match this job — and similar ones. Free.

Upload your resume and hirly scores it against this role at Galaxydigitalservices first, then against similar open jobs, and shows where you fit and why.

PDF or DOCX, up to 12MB. No sign-up to see your matches.

Get past the screening software and onto a recruiter's desk

hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.

  • Keywords matched to this posting
  • Fit score before you apply
  • Cover letter included

Matched against 2.9M live jobs from 220,000+ employers in 200+ countries.

Tailor my resume for this job →

Apply from your AI assistant

Connect hirly to Claude or ChatGPT and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending.

Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.

hirly's read of this role

Seniority
Lead / management
Country
US
Work mode
On-site / unstated
First seen by hirly
16 Oct 2026

Derived automatically from the posting. Upload your resume above to see how the role scores against it.

the posting

Who We Are:

Galaxy Digital Inc. (Nasdaq: GLXY) is a global leader in digital assets and data center infrastructure, growing the economy that runs on code. Galaxy delivers the onchain infrastructure that connects institutions to digital assets, including trading, advisory, asset management, staking, self-custody, and tokenization. Galaxy also develops and operates data center infrastructure to power AI and HPC workloads. Anchored by its Helios campus in Texas, Galaxy is building a multi-gigawatt pipeline of more than 5.7 GW of potential capacity, positioning it among the largest and fastest-growing data center developers in North America.

The Company is headquartered in New York City, with offices across North America, Europe, the Middle East, and Asia.

Additional information about Galaxy's businesses and products is available on www.galaxy.com .

What We Value:

We are a diverse team of free thinkers, and fast movers united to help investors and creators energize the global economy. We are looking for individuals who thrive in a culture of builders and overachievers and embrace high performance, transparent feedback, and a mission-first approach. Our culture shapes our way of working and gets us where we want to be.

Seek Excellence.

Be Selective To Be Effective.

Be Highly Aligned, Loosely Coupled.

Disagree Transparently.

Encourage Independent Decision-Making.

Build Dream Teams.

Who You Are:

You are a hands-on construction leader within our Data Centers team, who has delivered large-scale, mission-critical data center or comparable infrastructure from start of construction through commissioning and turnover. You know what it takes to run a major building on a live campus: sequencing trades, protecting the schedule, and keeping safety and quality from becoming trade-offs. You lead teams from the front, hold contractors and partners to a high standard, and raise issues early and honestly. You are equally comfortable walking the building with a superintendent and presenting schedule, cost, and risk to senior leadership. You believe the digital economy depends on infrastructure delivered right, and delivered on time.

What You'll Do:

As Senior Manager, Data Center Construction at Galaxy's Helios campus in Afton, TX, you will be Galaxy's accountable leader for construction of a large-scale data center building on the campus. You will report to the VP, Campus Construction Manager and work alongside peer Senior Managers who each own a building or scope, with shared accountability for the safety, schedule, cost, and quality standards that keep the campus aligned. You will own your building from preconstruction handoff through commissioning and turnover to operations, and you will lead the on-site Galaxy team and contractor relationships that make it happen.

Key Responsibilities:

Own Data Center Facility Delivery: Serve as the single point of accountability for construction of a large-scale data center facility, from GMP handoff through energization, Level 1-5 commissioning, integrated systems testing (IST), and turnover to operations. Drive the facility to its safety, schedule, cost, and quality commitments.

Manage Schedule and Progress: Own the building schedule and track progress against baseline. Identify critical-path threats early, and direct recovery and mitigation plans before they affect milestones. Provide clear schedule inputs to the campus master schedule.

Manage Project Risk and Contingency: Maintain a quantified risk register covering schedule, cost, supply chain, labor, weather, and trade-interface risks. Control owner contingency drawdown, run structured risk reviews with the GC and trade partners, and drive mitigation before exposure becomes impact.

Drive Safety Culture: Set and enforce Galaxy's safety standards at the building level. Partner with Galaxy EHS and contractor safety leadership to sustain a zero-incident environment, and hold the team accountable for leading indicators as well as outcomes.

Oversee Contractors and Trade Partners: Manage the day-to-day and executive-level relationship with the general contractor and key trade partners. Ensure alignment on milestones, quality, safety, staffing, and commercial performance, and escalate issues early.

Control Cost and Change: Oversee pay applications, change orders, forecasts, and budget tracking for your building under the GMP. Enforce disciplined change management and provide accurate cost reporting to campus and executive leadership.

Lead Integrated Project Controls and Forecasting: Own the facility's integrated cost, schedule, and cash flow forecast on a monthly cycle. Validate GC-reported progress against independent percent-complete and earned value analysis, report cost-to-complete and forecast variances, and give development and finance leadership a reliable view of capital deployment and funding requirements.

Administer the Commercial Framework: Administer the GMP agreement and related owner contracts, including notices, allowances, buyout and savings, delay and impact claims, backcharges, retainage, and lien waivers. Protect Galaxy's commercial position and resolve disputes at the lowest level possible, partnering with Legal as needed.

Manage OFCI Integration: Work closely with Pre-Construction and the OFCI procurement and logistics teams to ensure UPS, generators, chillers, switchgear, and other owner-furnished equipment arrive, are set, and are installed without impacting the construction schedule.

Drive Utility and Energization Readiness: Coordinate with the serving utility, interconnect and substation teams, and Galaxy's power development group to align permanent power availability, energization sequencing, and test windows with construction and commissioning milestones. Treat power delivery as a critical-path item and escalate early.

Lead Commissioning and Turnover: Partner with the on-site commissioning manager, 3rd party Cx agent, and operations teams to ensure systematic testing, closeout, and clean turnover of the building to operations.

Manage Customer Delivery Commitments: Serve as the construction lead for customer-facing delivery milestones, including ready-for-service dates. Ensure facility handoff meets contractual commitments and the customer's acceptance criteria.

Ensure Quality: Enforce Galaxy's QA/QC standards on your building. Escalate and resolve systemic quality issues with contractors and design partners.

Coordinate Across the Campus: Work with peer Senior Managers and the VP to resolve cross-building conflicts in resources, laydown, site logistics, access, utilities, and sequencing.

Advance Lean and Prefabrication: Apply Galaxy's modularization, prefabrication, and lean delivery initiatives on your building, and capture lessons learned so each building is more repeatable than the last.

Manage Regulatory and Inspection Requirements: Work with local authorities, inspectors, utilities, and consultants to ensure compliance with codes and permit requirements.

Report to Leadership: Provide frequent, candid status updates to senior leadership and communicate building status, risks, and forecasts to internal stakeholders across Pre-Construction, Design Engineering, Operations, and Security.

What We're Looking For:

Bachelor's degree in Construction Management, Engineering, Architecture, or equivalent experience.

7+ years of experience delivering large-scale mission-critical projects, with at least 3 years in a senior role leading a project or building team through construction.

Demonstrated success delivering a data center, or comparable mission-critical facility, from start of construction through commissioning and turnover.

Working knowledge of construction delivery models (including GMP), risk management, and contractor oversight.

Technical fluency across MEP, commissioning, civil, and structural systems.

Experience integrating OFCI equipment and supporting commis

Original posting on Galaxydigitalservices's site ↗

Listed on hirly, a job board. hirly is not the employer: Galaxydigitalservices is hiring for this role.

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job