hirly

Iron Mountain

Senior Project Manager (Data Centre Construction)

UK | England | Remote · UK | Slough | 724 – 729 Dundee Road

See how you match this job — and similar ones. Free.

Upload your resume and hirly scores it against this role at Iron Mountain first, then against similar open jobs, and shows where you fit and why.

PDF or DOCX, up to 12MB. No sign-up to see your matches.

Get past the screening software and onto a recruiter's desk

hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.

  • Keywords matched to this posting
  • Fit score before you apply
  • Cover letter included

Matched against 2.6M live jobs from 210,000+ employers in 200+ countries.

Tailor my resume for this job →

Apply from your AI assistant

Connect hirly to Claude or ChatGPT and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending.

Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.

hirly's read of this role

Seniority
Lead / management
Country
GB
Work mode
On-site / unstated
First seen by hirly
7 Nov 2026

Derived automatically from the posting. Upload your resume above to see how the role scores against it.

the posting

At Iron Mountain we know that work, when done well, makes a positive impact for our customers, our employees, and our planet. That’s why we need smart, committed people to join us. Whether you’re looking to start your career or make a change, talk to us and see how you can elevate the power of your work at Iron Mountain.

We provide expert, sustainable solutions in records and information management, digital transformation services, data centers, asset lifecycle management, and fine art storage, handling, and logistics. We proudly partner every day with our 225,000 customers around the world to preserve their invaluable artifacts, extract more from their inventory, and protect their data privacy in innovative and socially responsible ways.

Are you curious about being part of our growth stor​y while evolving your skills in a culture that will welcome your unique contributions? If so, let's start the conversation.

Iron Mountain is seeking a strategic Facilities and Construction Senior Project Manager to join our EMEA Facilities and Construction Project Management team .

In this role, you will take day-to-day delivery ownership of our landmark data center development program in London area, turning complex engineering plans into critical physical reality. Working directly on-site, you’ll lead our high-profile build from procurement through handover, ensuring state-of-the-art digital infrastructure is delivered safely, sustainably, and with uncompromised quality. Here, your technical leadership will directly shape the facilities that power our digital future.

What You’ll Do (Responsibilities) In this role, you will:

  • Drive on-site program execution: Serve as the part of the site delivery team for the multi-facility data center campus and high-voltage substation works, orchestrating consultant teams and specialist project controls.
  • Manage OFCI packages: Direct the end-to-end procurement, factory testing, logistics, and site delivery of critical Owner-Furnished, Contractor-Installed plant equipment, including switchgear, UPS systems, generators, and chillers.
  • Oversee contractor performance: Hold Tier-1 General Contractors accountable to milestone schedules, quality benchmarks, and stringent UK safety standards under CDM 2015 regulations.
  • Maintain commercial and regulatory governance: Manage project budgets, cash flow forecasting, and change orders under internal corporate governance, while liaising with Local Planning Authorities and the Environment Agency to satisfy statutory conditions.

What You’ll Bring (Skills & Qualifications) The ideal candidate will have:

  • 8+ years of project management experience in large-scale UK commercial or infrastructure construction, with direct data center (MEP/CSA) build experience preferred.
  • Strong knowledge of UK building regulations, supply chain dynamics, and Health and Safety governance under CDM 2015.
  • Proven track record managing long-lead OFCI equipment packages, GC tender evaluations, and complex utility or high-voltage substation grid connections.
  • Bachelor’s degree in Engineering, Construction Management, Project Management, or a related field; professional accreditation (such as MCIOB, MRICS, MAPM, or CEng) is highly desirable.

What We Offer (Benefits)

  • Location: London Area, UK (Site-based / hybrid near the build location)
  • Shifts: Monday to Friday, 37.5 hours per week
  • Competitive compensation and benefits aligned with experience.
  • Generous paid time off and bank holidays.
  • Flexible work options/alternative work options to support work–life balance.
  • Comprehensive health, wellness, and retirement plans.
  • Opportunities for continuous learning and professional growth.

If you are ready to bring your construction expertise to a landmark infrastructure program, apply today and build what's next with Iron Mountain.

Category: Real Estate & Facilities

Original posting on Iron Mountain's site ↗

Listed on hirly, a job board. hirly is not the employer: Iron Mountain is hiring for this role.

Browse similar roles

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job