Cumming Group
Senior Project Manager - Utility Electrical (Data Center Construction)
Vernon, TX
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Apply from your AI assistant
Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Lead / management
- Stated salary
- $82,700 per year
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 1 Oct 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
World Wide Professional Solutions is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.
Senior Project Manager - Utilities Electrical
We are seeking an experienced Senior Project Manager - Utilities Electrical to lead the utility electrical infrastructure and high-voltage substation scope for a large-scale data center project in Vernon, TX. This is a full-time, onsite role responsible for managing all phases of project delivery, from design and procurement through construction, commissioning, energization, and closeout.
Key Responsibilities
- Lead delivery of utility electrical and high-voltage substation projects from planning through turnover.
- Manage project budgets, schedules, forecasts, contracts, procurement, and risk mitigation.
- Act as the primary liaison between utility providers, contractors, engineers, vendors, and site leadership.
- Oversee construction, QA/QC, testing, commissioning, and energization activities.
- Ensure compliance with safety standards, electrical codes, and project requirements.
- Lead multidisciplinary teams to achieve project goals related to safety, quality, schedule, and cost.
- Serve as the Owner's Representative for the utility electrical and substation package.
- Lead coordination between utility providers, contractors, engineers, vendors, commissioning teams, and data center stakeholders.
- Oversee utility interconnections, substations, transformers, switchgear, protection and controls, SCADA, grounding, and power distribution systems.
- Manage energization planning, testing, commissioning, and turnover of mission-critical power infrastructure.
- Focus on utility and substation construction rather than building-level electrical systems.
Required Qualifications
- Bachelor's degree in Electrical Engineering, Construction Management, or a related field.
- 12+ years of project management experience with electrical infrastructure or power delivery projects.
- Experience delivering utility substations, high-voltage infrastructure, utility interconnections, transmission/distribution systems, or mission-critical power projects.
- Proven experience managing projects exceeding $50M.
- Strong knowledge of substations, transformers, switchgear, breakers, protection and controls, grounding systems, cable systems, and energization.
- Ability to interpret single-line diagrams, electrical drawings, specifications, and commissioning procedures.
- Experience with electrical QA/QC, testing, commissioning, turnover, and energization planning.
- Proficiency with Procore, Primavera P6, MS Project, and Microsoft Office.
- Strong leadership, communication, and stakeholder management skills.
Preferred Qualifications
- Experience with hyperscale data centers, utility, industrial, or mission-critical construction projects.
- PMP and/or PE certification.
- Previous experience serving as an Owner's Representative on large-scale electrical utility or substation projects.
- Experience leading utility interconnections, switching coordination, and substation energization activities.
#LI-SJ2
World Wide Professional Solutions (WWPS) is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is WWPS' policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.
All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, WWPS complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.
The salary range for this full-time role is $82,700.00-$190,900.05 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. World Wide Professional Solutions reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.
In addition to base salary, WWPS offers a comprehensive benefits package including:
Medical
Dental Insurance
Vision Insurance
401(k)
401(k) Matching
Paid Time Off
Paid Holidays
Short and long-term disability
Employee Assistance Program
Listed on hirly, a job board. hirly is not the employer: Cumming Group is hiring for this role.
Similar jobs
- Senior Project ManagerBlack Box · ABILENE, TX, United StatesFirst seen today
- Sr. Project ManagerBlack Box · ABILENE, TX, United StatesFirst seen today
- Project Manager II, Land DevelopmentMichael Baker International · Temecula, CA, United StatesFirst seen today
- Broadband Project Manager (Consulting) RemoteMichael Baker International · United StatesFirst seen todayremote
- Project ManagerDarling Ingredients · Cold Spring, KY, United StatesFirst seen today
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job