hirly

Wwprosolutions

Senior Project Manager, Vernon, TX – Data Center Construction

Vernon, TX

hirly Pro

Get in front of the people hiring at Wwprosolutions

  • Reach the hiring manager at Wwprosolutions on LinkedIn, from your own account
  • hirly applies to this job for you, with unlimited applications
  • A resume and cover letter written for this job, unlimited
  • The hiring manager and recruiter at Wwprosolutions, with contact details
Get Pro for this job →

$49 a month · ₹1,999 for 30 days in India · cancel any time

See how you match this job — and similar ones. Free.

Upload your resume and hirly scores it against this role at Wwprosolutions first, then against similar open jobs, and shows where you fit and why.

PDF or DOCX, up to 12MB. No sign-up to see your matches.

Get past the screening software and onto a recruiter's desk

hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.

  • Keywords matched to this posting
  • Fit score before you apply
  • Cover letter included

Matched against 2.8M live jobs from 220,000+ employers in 200+ countries.

Tailor my resume for this job →

Apply from your AI assistant

Connect hirly to Claude or ChatGPT and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending.

Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.

hirly's read of this role

Seniority
Lead / management
Country
US
Work mode
On-site / unstated
First seen by hirly
1 Sept 2026

Derived automatically from the posting. Upload your resume above to see how the role scores against it.

the posting

WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.

Who We Are

World Wide Professional Solutions is a project solutions organization focused on delivering complex, mission critical projects at a high level of execution. We specialize in owner’s representation across data centers, advanced manufacturing, and high-performance infrastructure environments.

Our teams operate where precision, speed, and reliability matter most. We implement lean construction, collaborative delivery models, and execution strategies that drive measurable performance improvements.

This is a company built for professionals who want to be closer to decision making, technical complexity, and real project impact.

The Opportunity

WWPS is hiring Senior Project Managers to lead large-scale data center construction projects across multiple cities in Texas.

This is a high visibility role where you will act as an extension of the owner’s team, leading execution across design, construction, commissioning, and turnover. You will have real ownership, not just coordination responsibility.

Project Locations

Stamford, TX

Haskell, TX

Vernon, TX

Wichita Falls, TX

Wherever you are based, we provide full relocation or travel support including per diem, ensuring a smooth transition so you can hit the ground running from day one.

What Makes This Role Different

Owner’s rep position with direct influence on outcomes

Large-scale, mission critical builds with complex infrastructure

Fast-paced environment with real decision-making authority

Full lifecycle exposure from design through commissioning

Highly technical projects involving power, cooling, and redundancy systems

What You Will Do

Lead full lifecycle delivery of data center construction projects from preconstruction through commissioning and turnover

Act as the primary leader across owners, design teams, contractors, and stakeholders

Drive schedule, budget, and execution strategy on projects exceeding $500M

Oversee site, CSA, MEP, controls, and commissioning scopes

Ensure alignment between design intent and field execution

Manage critical systems including UPS, switchgear, chillers, CRAH and CRAC units, and distribution infrastructure

Identify and resolve coordination and constructability challenges proactively

Lead commissioning efforts to ensure system performance and reliability

Enforce safety, quality, and compliance standards including NFPA, NEC, and OSHA

Implement lean construction practices to improve efficiency

Lead and mentor project teams

What You Bring

12 to 20+ years of construction project management experience

Strong experience with data center or mission critical projects

Deep understanding of MEP systems and electrical distribution

Proven ability to lead complex, multidisciplinary teams

Track record of delivering large-scale projects on time and on budget

Experience with commissioning, QA/QC, and construction best practices

Proficiency with Procore, Primavera P6, or MS Project

Preferred Background

Data center experience strongly preferred

Semiconductor, advanced manufacturing, pharmaceutical, or cleanroom experience is highly relevant

Bachelor’s degree in Construction Management, Engineering, or related field

PMP, LEED, CxA, or similar certifications are a plus

Compensation and Benefits

Highly competitive compensation aligned with senior-level leadership roles

Per diem and travel support where applicable

Medical, dental, and vision coverage

Life insurance and disability coverage

Company-matched retirement plan

Why Top Candidates Choose WWPS

Work on complex, high-impact projects in rapidly growing sectors

Operate in a true owner’s rep capacity with influence and visibility

Be part of a team focused on execution, not bureaucracy

Grow alongside major infrastructure and technology expansion across the U.S.

Join a company that is scaling and investing in top talent

Bottom Line

If you are a Senior Project Manager with mission critical experience who wants more ownership, more impact, and better projects, this is one of the strongest opportunities in the data center owners rep construction management space right now.

Original posting on Wwprosolutions's site ↗

Listed on hirly, a job board. hirly is not the employer: Wwprosolutions is hiring for this role.

Browse similar roles

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job