hirly

KALCON

Substation Project Manager - Data Center Construction

Houston, TX

hirly Pro

Get in front of the people hiring at KALCON

  • Reach the hiring manager at KALCON on LinkedIn, from your own account
  • hirly applies to this job for you, with unlimited applications
  • A resume and cover letter written for this job, unlimited
  • The hiring manager and recruiter at KALCON, with contact details
Get Pro for this job →

$49 a month · ₹1,999 for 30 days in India · cancel any time

See how you match this job — and similar ones. Free.

Upload your resume and hirly scores it against this role at KALCON first, then against similar open jobs, and shows where you fit and why.

PDF or DOCX, up to 12MB. No sign-up to see your matches.

Get past the screening software and onto a recruiter's desk

hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.

  • Keywords matched to this posting
  • Fit score before you apply
  • Cover letter included

Matched against 2.3M live jobs from 220,000+ employers in 200+ countries.

Tailor my resume for this job →

Apply from your AI assistant

Connect hirly to Claude or ChatGPT and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending.

Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.

hirly's read of this role

Role family
Supply chain
Seniority
Lead / management
Stated salary
$140,000 – $200,000 per year
Country
US
Work mode
On-site / unstated
First seen by hirly
8 Oct 2026

Derived automatically from the posting. Upload your resume above to see how the role scores against it.

the posting

The Substation Project Manager serves as the Owner's Representative responsible for the planning, execution, and delivery of high-voltage substation, utility interconnection, and transmission infrastructure projects supporting mission-critical data center developments. This role provides leadership across all phases of project delivery, including design coordination, procurement, construction, testing, commissioning, energization, and turnover. The Substation Project Manager is responsible for managing project scope, schedule, budget, quality, and risk while coordinating activities among contractors, utility providers, engineers, vendors, commissioning teams, and client stakeholders. The ideal candidate combines strong project management capabilities with a technical understanding of high-voltage electrical systems and the ability to drive accountability, resolve issues, and successfully deliver critical project milestones.

Minimum Qualifications:

Bachelor's degree in Electrical Engineering, Construction Management, Engineering, Project Management, or a related technical discipline, or equivalent relevant experience

7-10+ years of experience managing and delivering high-voltage substation, transmission, utility, power generation, industrial, mission-critical, or data center infrastructure projects

Demonstrated experience serving in a Project Manager, Owner's Representative, Construction Manager, EPC, or utility project leadership role

Strong understanding of high-voltage power systems, including substations, switchyards, utility interconnections, and transmission infrastructure

stakeholder communications

Familiarity with substation equipment including transformers, circuit breakers, protection relays, switchgear, buswork, and transmission line components

Working knowledge of applicable industry standards and codes including IEEE, ANSI, NESC, NFPA, and OSHA

Ability to read, interpret, and review engineering drawings, specifications, schedules, and electrical schematics

Strong leadership, problem-solving, negotiation, and communication skills

Experience working in active construction and commissioning environments

Proficiency with Microsoft Office and project management software; Primavera P6 experience preferred

PMP, CCM, PE, or similar professional certification preferred

Duties and Responsibilities:

Serve as the Owner's Representative overseeing the successful planning, execution, and delivery of high-voltage substation and utility infrastructure projects supporting data center developments

Manage project scope, schedule, budget, quality, safety, and risk throughout the project lifecycle

Lead coordination efforts among utility providers, design consultants, contractors, commissioning teams, vendors, and client stakeholders

Monitor project progress against established milestones and develop mitigation strategies to address schedule or budget impacts

Facilitate project meetings and provide executive-level reporting on project status, risks, procurement activities, construction progress, commissioning readiness, and key project metrics

Review contractor schedules and support validation of critical path activities, construction sequencing, and recovery plans

Oversee contractor performance and hold project teams accountable to contractual obligations, project milestones, and quality expectations

Coordinate utility interconnection activities, outage planning, permitting requirements, energization milestones, and regulatory compliance efforts

Review and validate engineering drawings, technical specifications, RFIs, submittals, change orders, and design modifications for compliance with project requirements and design intent

Support procurement efforts by coordinating long-lead equipment activities, vendor deliverables, factory testing, and equipment delivery schedules

Perform regular site visits to monitor construction progress, verify installation quality, identify risks, and ensure adherence to safety and environmental standards

Support testing, commissioning, energization, startup, and turnover activities for high-voltage electrical systems

Identify project risks and develop mitigation plans to minimize impacts to project objectives

Maintain accurate project documentation including meeting minutes, action logs, schedules, budgets, risk registers, RFIs, change orders, and project reports

Provide leadership in resolving technical, commercial, and construction-related issues in collaboration with project stakeholders

Support operational readiness and project turnover activities to ensure successful transition from construction to operations

Benefits Offered:

Medical insurance

Dental Insurance

Vision Insurance

Life Insurance

Accident Insurance

Long Term Disability

401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%

15 days of paid time off

8 paid National Holidays

Reimbursement for professional licenses and certifications

Submission Requirements:

At a minimum, the candidate’s professional resume must include the following:

List of all Educational Achievements

List of all Professional Licenses or Certificates

List of Awards Received

Detailed Employment History with each company including:

Name & Contact Information of the firm or agency

Start Date and End Date (Month & Year)

Positions Held

At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.

Salary Range

$140,000 — $200,000 USD

Original posting on KALCON's site ↗

Listed on hirly, a job board. hirly is not the employer: KALCON is hiring for this role.

Browse similar roles

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job