FirstEnergy
Transmission Planning Engineer
Akron, OH, United States; Morristown, NJ, United States
Apply through hirly
Upload your resume and get a version tailored to this job, plus a cover letter, in about thirty seconds — before you create an account.
Apply with hirlyhirly's read of this role
- Seniority
- Mid level
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 27 Sept 2026
Derived automatically from the posting. Sign up to see how the role scores against your own resume.
the posting
FirstEnergy publishes the full text of this posting on its own careers page.
Read the full posting ↗Similar jobs
- Capacity Planning EngineerSec · 12100 Samsung Blvd, Austin, TX, USAFirst seen today
- Corporate Mine Planning EngineerHeidelbergmaterials · Irving, TXFirst seen today
- Water Resources Planning EngineerStantec · Sacramento, CA, United StatesFirst seen today
- Materials Planning Engineer - Front End US ExpansionMicron · Boise, ID - Main SiteFirst seen today
- Capacity and Capital Planning Engineer - FoundryIntel · 6 LocationsFirst seen today
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job