Association of Village Council Presidents
Typhoon Halong Lead Carpenter
Bethel, AK
hirly Pro
Get in front of the people hiring at Association of Village Council Presidents
- Reach the hiring manager at Association of Village Council Presidents on LinkedIn, from your own account
- hirly applies to this job for you, with unlimited applications
- A resume and cover letter written for this job, unlimited
- The hiring manager and recruiter at Association of Village Council Presidents, with contact details
$49 a month · ₹1,999 for 30 days in India · cancel any time
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Matched against 2.8M live jobs from 210,000+ employers in 200+ countries.
Tailor my resume for this job →Apply from your AI assistant
Connect hirly to Claude or ChatGPT and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Role family
- Skilled trades
- Seniority
- Lead / management
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 26 Sept 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
Description
SUMMARY : Lead carpenters must be able to lead a crew of 3 to 4 people. Remote Alaska residential remodeling experiences a plus.
PERFORMANCE RESPONSIBILITIES: include the following. Other duties may be assigned:
- Study individual job sites, plan work and accurately take off construction material
- Estimate amount of work and time required for job
- Experience building foundations and leveling buildings.
- Experience with all phases of residential construction. Installation of windows, doors, Insulation, sealing, flooring siding and roof work. Able to lay out and build stairs. Finish carpentry. Setting cabinets and counter tops. General understanding of electrical and plumbing.
- Manage materials and supplies as necessary to facilitate the efficient progression of work on the job.
- Understand construction logistics in Rural Alaska.
- Prepare project labor coding on timesheets
- Work with Human Resources Department, Transportation Director to hire supervisor, discipline, and if n necessary fire onsite employees.
- Interact with the general public maintaining a professional attitude and working relationship.
- Travels frequently within the region for projects.
Requirements
QUALIFICATIONS: To perform this job successfully, an individual must be able to perform each essential duty satisfactorily. The requirements listed below are representative of the knowledge, skill, and/or ability required. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. Fluency in Yup’ik and English is strongly preferred. Work will be in outdoor environments. May travel by jet, small plane, four wheeler, snow machine, boat.
REQUIREMENTS:
Supervisory Experience
Proof (evidence) of construction supervisory experience – minimum 4 years experience.
Provide resume of previous employment with references
Show proficiency with residential construction
EDUCATION and EXPERIENCE: Must have a High school diploma or GED. Four (4) years working in a carpenter position. Apprenticeship trade in construction or maintenance is strongly preferred. Must have experience in and knowledge of Personal Protective Equipment (PPE) and use it.
Certificates, Licenses, Registrations: Valid State of Alaska Driver’s License with a good enough driving record to be insured on the AVCP Vehicle Policy.
Listed on hirly, a job board. hirly is not the employer: Association of Village Council Presidents is hiring for this role.
Similar jobs
- Typhoon Halong CarpenterAssociation of Village Council Presidents · Bethel, AKFirst seen 42d ago
- Typhoon Halong CarpenterAssociation of Village Council Presidents · Bethel, AKFirst seen 42d ago
- Maintenance Technician | Camden Westwood/Asbury Village/CrestCamden · Morrisville, NC, United StatesFirst seen today
- Maintenance Technician | Camden DowntownCamden · Houston, TX, United StatesFirst seen today
- Production AssemblerEmerson · Chanhassen, MN, United States; Shakopee, MN, United States; Eden Prairie, MN, United StatesFirst seen today
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job