Cumming Group
Construction Scheduler
Los Angeles, CA
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Apply from your AI assistant
Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Mid level
- Stated salary
- $120,200 per year
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 17 Oct 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the impact you make. We are one of the fastest-growing project and cost management consultancies in the United States, as reflected in our top 15 rankings in ENR. With over 70 offices globally, an extremely diverse project portfolio, and double-digit year-over-year revenue growth, the opportunities to make your mark are limitless!
Our firm is currently hiring a Construction Scheduler based in the Los Angeles, CA area to support public works project types. The Construction Scheduler will develop, maintain, and report on schedules for a portfolio of recovery and rebuild capital projects. This is an outstanding opportunity to bring your specialized construction scheduling expertise to an industry leading team.
Essential Duties & Responsibilities:
- Develop and maintain comprehensive project schedules, identify relationships, logic, milestones, and constraints for a large public agency Capital Improvement Program (CIP).
- Review contractor baseline schedule submissions to verify that all work scope is properly identified and logically sequenced. Provide detailed written comments and feedback to ensure alignment with project objectives and timelines.
- Perform quality assurance and quality control (QA/QC) on contractor schedule submittals, ensuring conformance with the contract. Review critical path, cost loading, resource loading (man-hours), schedule content, recovery schedules, logic relationships, lags, constraints, and milestones for accuracy and completeness.
- Perform time impact analysis for any change orders that affect the construction schedule and participate in negotiations between the client Project Manager and contractors to resolve delay time settlements and mitigate schedule impacts.
- Conduct critical path analysis and earned value analysis regularly to ensure that construction projects remain on track and meet time and budget requirements. Provide reports to identify potential issues and corrective actions.
- Regularly perform QA/QC reviews on program schedules and master schedules to ensure accuracy and compliance with program standards. Ensure proper use of program-level standard codes, layouts, and reports to maintain data integrity.
Required Education and Experience:
- Bachelor's degree in Construction Management, Engineering, Architecture, or related field.
- Minimum of ten (10) years of experience in creating, updating, and maintaining project schedules for public agency CIP projects.
- Advanced proficiency in scheduling software, including Primavera P6 and Microsoft Project.
- Ability to develop critical path method (CPM) baseline schedules and maintain them through regular updates.
- Ability to build and maintain an integrated master program schedule across multiple concurrent projects.
- Ability to prepare and evaluate time impact analyses and delay claims.
- Ability to perform resource loading and cost loading and to support earned value reporting.
- Ability to produce clear schedule narratives, look-ahead schedules, milestone reports, and executive level summaries.
- Effective oral and written communication skills.
- Experience with disaster recovery or post-disaster rebuild programs preferred.
#LI-SV1
Cumming Group is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is Cumming Group’s policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.
All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, Cumming Group complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.
The salary range for this full-time role is $120,200.00-$160,266.69 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.
In addition to base salary, Cumming Group offers a comprehensive benefits package including:
- Medical
- Dental Insurance
- Vision Insurance
- 401(k)
- 401(k) Matching
- Paid Time Off
- Paid Holidays
- Short and long-term disability
- Employee Assistance Program
Listed on hirly, a job board. hirly is not the employer: Cumming Group is hiring for this role.
Similar jobs
- Construction SchedulerHoffman Construction Company · Boise, ID, United States; ID, United States; Hauser, ID, United States; Kuna, ID, United States; Lewiston Orchards, ID, United States; Moscow, ID, United States; Post Falls, ID, United StatesFirst seen 10d ago
- Construction Scheduler - MontgomeryFaithtechnologies · 2 LocationsFirst seen 13d ago
- Construction Scheduler - MonroeFaithtechnologies · 2 LocationsFirst seen 13d ago
- Construction Scheduler - Columbus, OHCmtsllc · Columbus, OhioFirst seen 16d ago
- Construction SchedulerWSP · Dallas, TX, United States; Houston, TX, United States; Austin, TX, United States; Corpus Christi, TX, United States; Tyler, TX, United States; San Antonio, TX, United States; Victoria, TX, United States; Tulsa, OK, United States; Baton Rouge, LA, United States; New Orleans, LA, United States; Belle Rose, LA, United StatesFirst seen 20d ago
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job