Faith Technologies
Construction Scheduler - Monroe
Nationwide · LA - Monroe
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Matched against 2.6M live jobs from 190,000+ employers in 200+ countries.
Tailor my resume for this job →Apply from your AI assistant
Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Mid level
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 3 Oct 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
You’ve discovered something special. A company that cares. Cares about leading the way in construction, engineering, manufacturing and renewable energy. Cares about redefining how energy is designed, applied and consumed. Cares about thoughtfully growing to meet market demands. And ─ as “one of the Healthiest 100 Workplaces in America” ─ is focused on the mind/body/soul of team members through our Culture of Care .
The purpose of this position is to plan and execute the Project Controls requirements for a project. This role is responsible for providing technical and administrative direction, coordination, evaluation, training, and coaching to a team of Project Controls specialists. This position serves as Control Team Leader/Project Controls Manager on medium and large-sized projects or as a Subject Manager Expert (SME) for the entire Project Controls Team. Acting as a key resource on a project team, the role will require collaboration at all levels.
MINIMUM REQUIREMENTS
Education: Bachelor’s Degree
Experience: 10 years of electrical contracting experience or MEP coordination
Travel: Up to 50%
Work Schedule: Typical work hours are between 7:00 a.m. and 5:00 p.m. Monday – Friday. However, work may be performed at any time on any day of the week to meet business needs.
KEY RESPONSIBILITIES
- Develop and implement a project controls plan as part of the Project Execution Plan (PEP) for the project execution.
- Plan and organize the setup of project baseline in project controls system, and implement a plan to track against the baseline on a regular basis.
- Develop cost, schedule, and commercial baseline.
- Responsible for providing technical and administrative direction, coordination, evaluation, training and coaching to a team of Project Controls specialists.
- Analyze variances in cost and schedule performance against the plan, and communicate the reasons for the issuance of variance and proposed mitigation plans to Project Management
- Supervise the implementation of Work Breakdown and Project Coding Structures for control and integrity of work to be performed as defined by the contract
- Performs other related duties as required and assigned.
The job description and responsibilities described are intended to provide guidelines for job expectations and the employee's ability to perform the position described. It is not intended to be construed as an exhaustive list of all functions, responsibilities, skills and abilities. Additional functions and requirements may be assigned by supervisors as deemed appropriate.
How Does FTI Give YOU the Chance to Thrive?
If you’re energized by new challenges, FTI provides you with many opportunities. Joining FTI opens doors to redefine what’s possible for your future.
Once you’re a team member, you’re supported and provided with the knowledge and resources to achieve your career goals with FTI. You’re officially in the driver’s seat of your career, and FTI’s career development and continued education programs give you opportunities to position yourself for success.
FTI is a “merit to the core” organization. We recognize and reward top performers, offering competitive, merit-based compensation, career path development and a flexible and robust benefits package.
Benefits are the Game-Changer
We provide industry-leading benefits as an investment in the lives of team members and their families. You’re invited to review the full list of FTI benefits available to regular/full-time team members. Start here. Grow here. Succeed here. If you’re ready to learn more about your career with FTI, apply today!
Faith Technologies, Inc. is an Equal Opportunity Employer – veterans/disabled.
Listed on hirly, a job board. hirly is not the employer: Faith Technologies is hiring for this role.
Similar jobs
- BGAD: Senior Construction Scheduler ( Contingency )Kbr · 2 LocationsFirst seen today
- Construction Scheduler-P6 (Onsite- Pampa, Texas) Mullins Mechanical · Abernathy, TX; Amarillo, TX; Dallas, TX; Dallas-Fort Worth, TX; Fort Worth, TX; Garland, TX; Houston, TX; Oklahoma City, OK; Plainview, TX; San Antonio, TX; Waco,TX; Wichita Falls, TXFirst seen todayremote
- Construction Scheduler, ANSJobgether · USFirst seen 2d agoremote
- Construction Scheduler - Columbus, OHCmtsllc · Columbus, OhioFirst seen 3d ago
- Construction SchedulerHoffman Construction Company · Boise, ID, United States; AZ, United States; OR, United States; WA, United States; ID, United StatesFirst seen 6d ago
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job