hirly

SpaceXAI

Construction Scheduler - Memphis

Southaven, MS · Memphis, TN

hirly Pro

Get in front of the people hiring at SpaceXAI

  • Reach the hiring manager at SpaceXAI on LinkedIn, from your own account
  • hirly applies to this job for you, with unlimited applications
  • A resume and cover letter written for this job, unlimited
  • The hiring manager and recruiter at SpaceXAI, with contact details
Get Pro for this job →

$49 a month · ₹1,999 for 30 days in India · cancel any time

See how you match this job — and similar ones. Free.

Upload your resume and hirly scores it against this role at SpaceXAI first, then against similar open jobs, and shows where you fit and why.

PDF or DOCX, up to 12MB. No sign-up to see your matches.

Get past the screening software and onto a recruiter's desk

hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.

  • Keywords matched to this posting
  • Fit score before you apply
  • Cover letter included

Matched against 2.8M live jobs from 220,000+ employers in 200+ countries.

Tailor my resume for this job →

Apply from your AI assistant

Connect hirly to Claude or ChatGPT and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending.

Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.

hirly's read of this role

Seniority
Mid level
Country
US
Work mode
On-site / unstated
First seen by hirly
21 Sept 2026

Derived automatically from the posting. Upload your resume above to see how the role scores against it.

the posting

SpaceX was founded under the belief that a future where humanity is out exploring the stars is fundamentally more exciting than one where we are not. Today, SpaceX is actively developing the technologies to make this possible, with the ultimate goal of making life multiplanetary and expanding consciousness to the stars.

SpaceXSI is building Super Intelligence to help humanity understand the universe. Our teams are building the full Super Intelligence stack: from our Colossus supercomputers, to Grok models, to our suite of applications, including Grok Bot, Grok Build, Grok Imagine, Grok Voice, and X. We're creating a powerful flywheel where more compute trains better models, better models power more useful products, and what we learn from people using those products shapes what we build next.

CONSTRUCTION SCHEDULER

Develop, maintain, and communicate construction schedules that the field, subcontractors, and leadership can actually use. You will build CPM baselines, update them from real progress, flag risk early, and explain schedule impact of changes, delays, and recovery plans. This is not a data-entry role. You need enough means-and-methods knowledge to challenge a sequence that will not work in the field.

Superintendents run the work; project managers own cost and contracts; the scheduler is the person who can tell you what is actually driving the end date, what slips if a trade is late, and whether a recovery plan is real.

RESPONSIBILITIES:

Build baseline CPM schedules from drawings, specs, estimates, bid packages, and construction sequences (WBS, activity coding, logic, calendars, and constraints used sparingly and correctly)

Maintain the live schedule: collect progress from superintendents, project managers, and trades; update percent complete, remaining duration, and logic; publish a clean current-period update on a set cadence (typically weekly look-aheads and monthly official updates)

Own the critical path. Identify near-critical work, float erosion, and out-of-sequence progress. Tell the team why the end date moved, not just that it did

Produce three-week (or similar) look-aheads that match the master schedule and what the field can actually crew

Analyze schedule impact of RFIs, change orders, design late-outs, access constraints, long-lead procurement, weather, and labor shortages. Prepare time-impact analyses (TIA) and what-if, recovery, and acceleration scenarios

Coordinate with project managers, superintendents, estimators, procurement, design, owners/CMs, and subcontractors so the schedule reflects committed dates, not wishful ones

Resource-load and, where required, cost-load the schedule. Flag crew stacking, craft shortages, and unrealistic production rates

Prepare narratives, variance reports, S-curves, histograms, and executive summaries for internal reviews and owner/CM submittals

Support claims and delay documentation with contemporaneous records (as-planned vs. as-built, fragnets, delay categorization) when needed

Enforce schedule standards: naming, coding, update process, backup, and version control so the file remains auditable

Facilitate or support pull-planning / Last Planner sessions and convert those commitments into logic in the CPM model

Visit the site regularly. A scheduler who never walks the job will be wrong

BASIC QUALIFICATIONS:

4+ years of construction scheduling on active projects (GC, CM, owner’s project controls, or specialty contractor)

4+ years of experience using Smartsheet, MS Project, or other project management tool

4+ years of experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics)

PREFERRED SKILLS AND EXPERIENCE:

Comfortability with multiple calendars, relationship types, filters, layouts, global vs. project data, and schedule quality checks (open ends, negative float, SS/FF overuse, constraints)

Bachelor’s in construction management, civil engineering, or a related field; OR equivalent field experience

PSP (AACE), PMI-SP, PMP, CCM, or similar credential

Experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics)

Forensic delay analysis, time-impact analysis, and claims support

Cost/resource loading, earned value, and integration with cost systems

Last Planner / pull planning; BIM 4D (Navisworks, Synchro) is a plus

Additional tools as applicable: Power BI, Smartsheet, Procore, Autodesk Construction Cloud

ADDITIONAL REQUIREMENTS:

Willing to work extended hours as needed, including the current 6-day / 12-hour construction cadence

Must be comfortable working in a fully onsite environment

SpaceXSI is an equal opportunity employer. For details on data processing, view our Recruitment Privacy Notice .

Original posting on SpaceXAI's site ↗

Listed on hirly, a job board. hirly is not the employer: SpaceXAI is hiring for this role.

Browse similar roles

Want this one?

Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.

Tailor my resume for this job