KALCON
TFO Project Manager - Data Center Construction
Abernathy, TX
hirly Pro
Get in front of the people hiring at KALCON
- Reach the hiring manager at KALCON on LinkedIn, from your own account
- hirly applies to this job for you, with unlimited applications
- A resume and cover letter written for this job, unlimited
- The hiring manager and recruiter at KALCON, with contact details
$49 a month · ₹1,999 for 30 days in India · cancel any time
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Matched against 2.7M live jobs from 210,000+ employers in 200+ countries.
Tailor my resume for this job →Apply from your AI assistant
Connect hirly to Claude or ChatGPT and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Lead / management
- Stated salary
- $100,000 – $150,000 per year
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 28 Sept 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
KALCON is seeking an experienced Tenant Fit‑Out (TFO) Project Manager to serve as an Owner’s Representative on newly constructed data center facilities. This role supports the Tenant Fit‑Out phase of data center delivery, which follows completion of the base build and focuses on the installation, integration, and turnover of tenant‑specific infrastructure within a brand‑new facility. The TFO Project Manager will oversee owner‑furnished and tenant‑specific scopes including white space build‑out, MEP distribution, equipment installation, system tie‑ins, testing, commissioning, and readiness for operations. The role interfaces closely with the base build team, general contractor, trade partners, and commissioning agents to ensure tenant scopes are delivered in alignment with design intent, schedule milestones, quality standards, and operational requirements.
Duties and Responsibilities:
Serve as the Owner’s Representative Project Manager for the Tenant Fit‑Out (TFO) phase of a newly constructed data center facility, representing owner/developer interests throughout execution, commissioning, and turnover.
Provide direct oversight of tenant fit‑out construction activities within a completed base build, including white space build‑out, power and mechanical distribution extensions, equipment installation, controls integration, and support infrastructure.
Act as the primary coordination point between the owner/developer, general contractor, base build team, tenant delivery teams, designers, and commissioning agents to ensure alignment across scopes and responsibilities.
Monitor and evaluate general contractor and subcontractor performance relative to approved schedule milestones, quality requirements, safety compliance, and sequencing, without directing construction means or methods.
Review, coordinate, and support approvals of submittals, RFIs, design clarifications, and field change requests related to tenant fit‑out and system integration scopes.
Track and manage tenant‑level schedule milestones, ensuring alignment with the overall campus master schedule and commissioning plan.
Identify schedule risk and support mitigation or recovery strategies in coordination with project controls leadership.
Participate in progress meetings, coordination meetings, and commissioning readiness discussions, documenting action items and driving timely resolution of tenant‑fit‑out-related issues.
Identify risks related to constructability, access, sequencing, shutdowns, system tie‑ins, and commissioning readiness, and proactively elevate concerns with recommended paths forward.
Support testing, commissioning, punch list execution, and readiness for turnover, verifying tenant systems are complete, coordinated, documented, and aligned with operational requirements.
Review and verify progress reporting, change impacts, and pay‑application support documentation associated with tenant fit‑out scopes, providing recommendations to the owner.
Provide clear, concise reporting to owner leadership on progress, risks, decisions, and issues impacting tenant delivery, schedule certainty, and operational readiness.
Additional duties as assigned by Management
- Benefits Offered:
- Medical insurance
- Dental insurance
- Vision insurance
Life Insurance
Accident Insurance
Long Term Disability
- 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
- 15 days of paid time off
- 8 paid national holidays
- Reimbursement for professional licenses and certifications
Submission Requirements:
At a minimum, the candidate’s professional resume must include the following:
List of all Educational Achievements
List of all Professional Licenses or Certificates
List of Awards Received
Detailed Employment History with each company including:
Name & Contact Information of the firm or agency
Start Date and End Date (Month & Year)
Positions Held
At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.
Salary Range
$100,000 — $150,000 USD
Listed on hirly, a job board. hirly is not the employer: KALCON is hiring for this role.
Similar jobs
- Clinical Project Manager, Temp to PermProtara Therapeutics, Inc. · New York, NY/RemoteFirst seen todayremote
- NPI Project ManagerSI-BONE, Inc · San Jose, CAFirst seen todayremote
- Environmental Permitting Project ManagerWSP · Gainesville, FL, United States; Jacksonville, FL, United StatesFirst seen today
- ARS Project Manager, OneMHSAmazon · Nashville, Tennessee, USA; Bellevue, Washington, USA; Atlanta, Georgia, USA; Westborough, Massachusetts, USAFirst seen today
- Project ManagerContent Critical Solutions · Moonachie, NJFirst seen todayremote
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job