Mortenson
Construction Scheduler I and II - Solar
Minneapolis, MN, United States
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Apply from your AI assistant
Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Entry level
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 22 Oct 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
Mortenson publishes the full text of this posting on its own careers page.
Read the full posting ↗Listed on hirly, a job board. hirly is not the employer: Mortenson is hiring for this role.
Similar jobs
- Electrical Construction SchedulerHuntelectric · Salt Lake City, UtahFirst seen 2d ago
- Construction SchedulerCumminggroup · Los Angeles, CAFirst seen 8d ago
- Construction SchedulerHoffman Construction Company · Boise, ID, United States; ID, United States; Hauser, ID, United States; Kuna, ID, United States; Lewiston Orchards, ID, United States; Moscow, ID, United States; Post Falls, ID, United StatesFirst seen 18d ago
- Construction Scheduler - MontgomeryFaithtechnologies · 2 LocationsFirst seen 21d ago
- Construction Scheduler - MonroeFaithtechnologies · 2 LocationsFirst seen 21d ago
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job