Cmts LLC
P6 Construction Scheduler – Orlando, FL*
Jacksonville, Florida
Get past the screening software and onto a recruiter's desk
hirly rewrites your resume for this job — matching the keywords and skills in the posting, moving your most relevant experience to the top, and writing a cover letter to fit. About 30 seconds.
- Keywords matched to this posting
- Fit score before you apply
- Cover letter included
Matched against 2.7M live jobs from 200,000+ employers in 200+ countries.
Tailor my resume for this job →Apply from your AI assistant
Connect hirly to Claude and ask it to apply to this job. hirly tailors your resume, fills the employer’s form and asks before sending. ChatGPT: manual setup today.
Some employer sites stop an application at a CAPTCHA or sign-in and hand it back with a link. Applying needs a paid plan. Works with any assistant that supports MCP.
hirly's read of this role
- Seniority
- Mid level
- Country
- US
- Work mode
- On-site / unstated
- First seen by hirly
- 1 Sept 2026
Derived automatically from the posting. Upload your resume above to see how the role scores against it.
the posting
Scheduler – Orlando, FL
Full-Time | On-Site | Orlando, FL
Why CMTS
Every day at CMTS, our team delivers infrastructure projects that positively impact lives and communities. With over 42 years of industry experience, CMTS has built a strong foundation for continued success, providing project and construction management services to public and private clients nationwide.
We value our employees by fostering a culture of learning, professional development, and collaboration. CMTS is committed to maintaining a work environment that emphasizes safety, integrity, and accountability while supporting work-life balance and employee well-being. Our teams are empowered to grow, contribute, and make a meaningful impact through the projects we deliver.
About Your Role
The Scheduler is responsible for developing, maintaining, and analyzing project schedules for aviation capital improvement and infrastructure projects. This position supports project teams by providing schedule management, forecasting, progress tracking, and schedule performance analysis throughout all phases of project delivery. The successful candidate will have experience working on active airport projects and developing Critical Path Method (CPM) schedules for complex, phased construction programs.
Education Requirements
Bachelor's Degree
Certification Requirements
Primavera P6 Certification or demonstrated proficiency using Primavera P6 scheduling software
What You'll Need to Get the Job Done
Minimum five (5) years of scheduling experience on active airport projects.
Experience developing, maintaining, and analyzing Critical Path Method (CPM) schedules.
Experience supporting complex phased construction projects in operational environments.
What You'll Do
Develop, maintain, and update project schedules throughout the project lifecycle.
Analyze schedule performance and identify critical path impacts and schedule risks.
Prepare schedule updates, forecasts, recovery plans, and schedule narratives.
Review contractor baseline schedules, monthly updates, and recovery schedules for compliance with project requirements.
Evaluate schedule changes and assess the impact of delays, disruptions, and change orders.
Support project forecasting, reporting, and executive-level schedule presentations.
Coordinate with project managers, contractors, consultants, and stakeholders to maintain schedule accuracy.
Monitor project progress and verify schedule status against field activities.
Assist with schedule risk assessments and mitigation planning.
Prepare schedule analyses to support project decision-making and project controls activities.
Maintain schedule documentation and historical records.
Perform related duties as assigned.
What You Can Expect from CMTS
Opportunities to work on high-profile aviation and airport infrastructure projects.
Collaborative and growth-focused team environment.
Competitive compensation and benefits package.
Career advancement and professional development opportunities.
A culture focused on safety, integrity, accountability, and employee well-being.
Opportunity to support critical transportation infrastructure serving communities nationwide.
100% company-paid medical, dental, vision, 401(k), life insurance, and long-term disability coverage.
Pay Rate
$50.00 – $75.00 per hour
A bonus may be granted to employees depending on individual performance, employee utilization, attendance, tenure, and furtherance of other non-financial corporate goals; bonus opportunities are available at management’s discretion.
Apply Now!
Visit our careers page to learn more and apply.
Equal Employment Opportunity
CMTS, LLC is an Equal Opportunity Employer and does not discriminate based on race, color, religion, national origin, ancestry, citizenship status, age, disability, sex, marital status, veteran status, sexual orientation, genetic information, or any other protected characteristic under applicable federal, state, or local law.
This version aligns with CMTS's standard posting format and emphasizes aviation scheduling, CPM expertise, Primavera P6 proficiency, and airport construction phasing experience.
Listed on hirly, a job board. hirly is not the employer: Cmts LLC is hiring for this role.
Similar jobs
- Construction Scheduler - MontgomeryFaithtechnologies · 2 LocationsFirst seen today
- Construction Scheduler - MonroeFaithtechnologies · 2 LocationsFirst seen today
- Construction Scheduler-P6 (Onsite- Pampa, Texas) Mullins Mechanical · Abernathy, TX; Amarillo, TX; Dallas, TX; Dallas-Fort Worth, TX; Fort Worth, TX; Garland, TX; Houston, TX; Oklahoma City, OK; Plainview, TX; San Antonio, TX; Waco,TX; Wichita Falls, TXFirst seen todayremote
- Construction Scheduler, ANSJobgether · USFirst seen yesterdayremote
- Construction SchedulerHoffman Construction Company · Boise, ID, United States; AZ, United States; OR, United States; WA, United States; ID, United StatesFirst seen 5d ago
Browse similar roles
Want this one?
Upload your resume and hirly rewrites it for this job and writes the cover letter — in about thirty seconds, before you sign up.
Tailor my resume for this job